Notice of nighttime road closure on Hokkaido Expressway
-Road maintenance and repair work-
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Notice of nighttime road closure on Hokkaido Expressway
The latest regulatory information isDraTraPlease see.
August 5, 2019
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Atsubetsu-ku, Sapporo) has closed night traffic and partially closed the interchange (IC) due to road surface repair work, equipment inspection, etc. so that Expressway I will do it.
We apologize for the inconvenience, and thank you for your understanding and cooperation.
1-line closed section and period
Road name | section | period | Attachment |
---|---|---|---|
E38 Doto Expressway |
Ikeda IC ⇔ Honbetsu IC, Ashoro IC (Both directions) |
August 19th (Monday) -September 4th (Wednesday) [13 nights excluding Saturdays and Sundays] From 22:00 each day to 6:00 the next morning |
Leaflet 1 [PDF: 308KB] |
Chitose Eniwa JCT ⇔ Chitose East IC (Both directions) |
August 19th (Monday) to 22nd (Thursday) [4 nights excluding Saturdays and Sundays] From 22:00 each day to 6:00 the next morning |
Leaflet 2 [PDF: 881KB] |
|
Chitose East IC ⇔ Oiwake Town IC (Both directions) |
August 23rd (Friday) -28th (Wednesday) [4 nights excluding Saturdays and Sundays] From 22:00 each day to 6:00 the next morning |
||
Oiwake IC ⇔ Yubari IC (Both directions) |
August 29th (Thursday) -September 9th (Monday) [8 nights excluding Saturdays and Sundays] From 22:00 each day to 6:00 the next morning |
||
E5 Do-O Expressway |
Onuma Park IC ⇔ Yakumo IC (Both directions) |
August 26th (Monday) -September 3rd (Tuesday) [7 nights excluding Saturdays and Sundays] From 22:00 each day to 6:00 the next morning |
Leaflet 3 [PDF: 820KB] |
Ochibe IC ⇔ Yakumo IC (Both directions) |
September 4th (Wednesday) -9th (Monday) [4 nights excluding Saturdays and Sundays] From 22:00 each day to 6:00 the next morning |
2 IC partially closed section and period
Road name | section | period | Attachment |
---|---|---|---|
E5 Do-O Expressway |
Fukagawa IC (The entrance to Asahikawa) |
From Monday, August 19 to 20th Tuesday [2 nights] From 22:00 to 6:00 the next morning |
Leaflet 4 [PDF: 308KB] |
Fukagawa IC (Exit for Sapporo) |
Wednesday, August 21-23 (Friday) [3 nights] From 22:00 to 6:00 the next morning |
- In case of bad weather, it will be postponed at the same time on the spare day. Please see the attached leaflet for spare days and detours.
3 Main work contents
- Road surface repair work: Repairs places where cracks or steps on the pavement surface are prominent.
- Equipment inspection: We will regularly inspect various equipment installed on the premises of the Expressway
4 Information during the construction period
Construction regulation information is provided through the following media.
(1) Internet
"Construction regulation information" is posted in "Regional information (Hokkaido) DraPla
The latest traffic information is posted in "Drive Traffic (DraTra)".
(2) SNS
The official Twitter account "NEXCO EAST (Hokkaido)" (@e_nexco_kita) provides the latest traffic information.
(3) Flyers, posters
It is distributed and posted at each service area / parking area of the Expressway Regional Head Office NEXCO EAST Hokkaido branch office.
(Four) phone
- 『NEXCO東日本お客さまセンター』
24時間365日、高速道路に関する様々なお問合せにお答えします。
電話番号
0570-024-024(または03-5338-7524) - "Highway Telephone" Real-time traffic information (updated for 5 minutes) is provided 24 hours a day.
- 『日本道路交通情報センター』
最新の交通情報を提供しています。
電話番号 050-3369-6760
(Note) Please be careful not to make a mistake.
If you call "# 8162" with your mobile phone, the latest Expressway conditions in the area closest to that location will be provided by automatic voice anywhere in the country.
(Five) Road traffic information available while driving
- Road information board
- Highway radio (1620kHz)
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.