Notice of nighttime road closure on Hokkaido Expressway
-Road maintenance and repair work-
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Notice of nighttime road closure on Hokkaido Expressway
The latest regulatory information isDraTraPlease see.
2019 March 25
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Atsubetsu Ward, Sapporo City) is involved in various equipment inspections, road surface repair work, structure repair work, and other maintenance work in order to enable customers to use the Expressway safely, safely and comfortably. We will close at night and partially close the interchange (IC).
We apologize for the inconvenience and ask for your understanding and cooperation.
1-line closed section and period
Road name | section | period | Attachment |
---|---|---|---|
E5 Do-O Expressway | Onuma Park IC ⇔ Ochibe IC (Both directions) | Monday, April 8-10 (Wednesday) [3 nights] Every day from 22:00 to 6:00 the next morning | Flyer-1 [PDF: 280KB] |
Muroran IC ⇔ Noboribetsu Muroran IC (Both directions) | April 15th (Monday) to 17th (Wednesday) [3 nights] Every day from 22:00 to 6:00 the next morning | Flyer-2 [PDF: 960KB] | |
Osyamanbe IC ⇔ Date IC (Both directions) | Monday, April 22 [1 night] From 22:00 to 6:00 the next morning | Flyer-3 [PDF: 345KB] | |
E62 Fukagawa / Rumoi Expressway | Fukagawa JCT ⇔ Fukagawa West IC (Both directions) | From Monday, April 15 to 24th Wednesday [8 nights except Saturday and Sunday] Every day from 22:00 to 6:00 the next morning | Flyer-4 [PDF: 397KB] |
- In case of bad weather, it will be postponed at the same time from the next day. Please see the attached leaflet for the spare days and detours for postponement.
2 IC partially closed section and period
Road name | section | period | Attachment |
---|---|---|---|
E5 Do-O Expressway | Noboribetsu Muroran IC (Exit to Route 36) | Monday, April 8 6:00 to Wednesday, April 10 18:00 [60 hours continuous closure] | Flyer-5 [PDF: 165KB] |
Noboribetsu Muroran IC (Entrance from Route 36) | Monday, May 13 6:00 to Wednesday, May 15 18:00 [60 hours continuous closure] |
- In case of bad weather, it will be postponed at the same time from the next day. Please see the attached leaflet for the spare days and detours for postponement.
3 Main work contents
- Road surface repair work: We will repair areas where cracks or steps on the pavement surface are prominent.
- Structural repair work ... We will replace the structural joints.
- Inspection of various equipment
4 Information during the construction period
Construction regulation information is provided through the following media.
(1) Internet
- "NEXCO EAST Dorapura" 's " Local information (Hokkaido) "Construction regulation information" is posted.
- 『 Drive traffic ] For the latest traffic information.
(2) SNS
Official Twitter account "NEXCO EAST (Hokkaido)" ( @e_nexco_kita ) Provides the latest traffic information.
(3) Flyers, posters
They are distributed and posted at each service area, parking area, tollgate office, expressway at NEXCO EAST Hokkaido branch, etc. on highway.
(4) Telephone
- "NEXCO EAST Customer Center"
24時間365日、高速道路に関する様々なお問合せにお答えします。
電話番号
0570-024-024(または03-5338-7524) - "Highway Telephone": Provides real-time traffic information (updated for 5 minutes) 24 hours a day.
電話番号
0166-54-1620(旭川)
011-896-1620(札幌)
0143-59-1620(室蘭)
0155-42-1620(帯広)
(注)おかけ間違いのないようにご注意ください。" # 8162 When you call "" on your mobile phone, we will automatically provide you with the latest Expressway status in the nearest area from anywhere in the country.
- "Japan Road Traffic Information Center": Provides the latest traffic information.
電話番号
050-3369-6760
(5) Road traffic information available while driving
- Road information board
- Highway radio (1620kHz)
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.