Notice of night traffic closure on Expressway in Hokkaido
-Road maintenance and repair work-
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Notice of night traffic closure on Expressway in Hokkaido
August 17, 2018
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Atsubetsu Ward, Sapporo City) has various facilities such as inspection, road surface repair work, bridge repair work, sign renewal work, tunnels, etc. in order to provide customers with safe, secure and comfortable use of the Expressway We will close the nighttime and partially close the interchange (IC) at night due to lighting replacement work and other maintenance work.
We apologize for the inconvenience and ask for your understanding and cooperation.
1 closed section and period
Road name | section | period | Main construction contents | Attachment |
---|---|---|---|---|
E5 Do-O Expressway | Date IC ⇔ Muroran IC (Both directions) | From Wednesday, August 22 to 28th Tuesday [5 nights except Saturday and Sunday] Every day from 20:00 to 6:00 the next morning | Inspection of various equipment Road surface repair work Sign renewal construction Tunnel lighting replacement work | Leaflet-1 [PDF: 235KB] |
Toyoura IC ⇔ Date IC (Both directions) | From Wednesday, August 22 to Friday, September 14 [18 nights except Saturday and Sunday] Every day from 20:00 to 6:00 the next morning | |||
Chomanbe IC ⇔ Toyoura C (Both directions) | September 12th (Wednesday) -14th (Friday) [3 nights] Every day from 20:00 to 6:00 the next morning | |||
E38 E61 Doto Expressway | Otofuke Obihiro IC ⇔ Honbetsu IC / Ashoro IC (Both directions) | From Monday, August 20 to Tuesday, September 4 [10 nights except Friday, Saturday and Sunday] Every day from 20:00 to 6:00 the next morning | Road surface repair work Bridge repair work Sign renewal work, etc. | Leaflet-2 [PDF: 234KB] |
E38 Doto Expressway | Oiwakecho IC ⇔ Yubari IC (Both directions) | Monday, August 27th to Thursday, August 30th [4 nights] Every day from 20:00 to 6:00 the next morning | Inspection of various equipment Road surface repair work Cleaning / planting felling, etc. | Leaflet-3 [PDF: 655KB] |
Chitose Eniwa JCT ⇔ Oiwakecho IC (Both directions) | September 3 (Mon) to 6 (Thurs) [4 nights] Every day from 20:00 to 6:00 the next morning |
- In case of bad weather, it will be postponed at the same time from the next day.
- Please see the attached leaflet for detours and spare days for postponement.
2 Interchange partially closed section and period
Road name | section | period | Main construction contents | Attachment |
---|---|---|---|---|
E5 Do-O Expressway | Bibai IC (Entrance to Sapporo) | Monday, August 20 [1 night] From 20:00 to 6:00 the next morning | Road surface repair work, etc. | Leaflet-4 [PDF: 133KB] |
Bibai IC (Exit from Asahikawa) | August 21 (Tue) -22 (Wed) [2 night] Every day from 20:00 to 6:00 the next morning | |||
Bibai IC (Entrance to Asahikawa) | August 23 (Thursday) -28 (Tuesday) [4 nights except Saturday and Sunday] Every day from 20:00 to 6:00 the next morning | |||
Bibai IC (Exit from Sapporo) | From Wednesday, August 29 to Monday, September 3 [4 nights except Saturday and Sunday] From 20:00 to 6:00 the next morning | |||
E5 Do-O Expressway | Naie Sunagawa IC (Entrance to Sapporo) | Monday, August 27-Tuesday, 28th [2 night] From 20:00 to 5am the next morning | Road surface repair work Bridge repair work, etc. | Leaflet-5 [PDF: 223KB] |
Naie Sunagawa IC (Entrance to Sapporo and Asahikawa) | From Wednesday, August 29 to 30th Thursday [2 night] From 20:00 to 5am the next morning | |||
Naie Sunagawa IC (Exit from Asahikawa) | August 31 (Fri) -September 7 (Fri) [6 nights except Saturday and Sunday] From 20:00 to 5am the next morning |
- In case of bad weather, it will be postponed at the same time from the next day.
- Please see the attached leaflet for detours and spare days for postponement.
3 Main work contents
- Road surface repair work
We will repair the places where cracks and steps on the pavement surface are noticeable. - Bridge repair work
We will implement measures to prevent falling concrete fragments on the bridge.
4 Information during the construction period
Construction regulation information is provided through the following media.
(1) the Internet- "NEXCO EAST Dorapura" 's "Local information (Hokkaido) "Construction Regulation Information" is posted.
- 『 Drive traffic ] For the latest traffic information.
- Official Twitter account " NEXCO EAST (Hokkaido) (@E_nexco_kita) provides the latest traffic information.
They are distributed and posted at each service area, parking area, tollgate office, expressway at NEXCO EAST Hokkaido branch, etc. on highway.
- "NEXCO EAST Customer Center"
24時間365日、高速道路に関する様々なお問合せにお答えします。
電話番号
0570-024-024(または03-5338-7524) - "Highway Telephone" : Real-time traffic information (5 minutes update) is provided 24 hours a day.
電話番号
0166-54-1620(旭川)
011-896-1620(札幌)
0143-59-1620(室蘭)
0155-42-1620(帯広)
(注)おかけ間違いのないようにご注意ください。" # 8162 When you call "" on your mobile phone, we will automatically provide you with the latest Expressway status in the nearest area from anywhere in the country.
- "Japan Road Traffic Information Center" : Provides the latest traffic information.
電話番号
050-3369-6760
- Road information board
- Highway radio (1620kHz)
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.