First in Hokkaido! Started Expressway renewal project and floor slab replacement
[E5A] Between Sasson Expressway Asari IC and Zenako IC (upper and lower lines)
Notice of all-day face-to-face traffic regulation due to bridge renewal construction
- Corporate Top
- Press Room
- Press Release Hokkaido office
- First in Hokkaido! Started Expressway renewal project and floor slab replacement
August 14, 2017
East Nippon Expressway Co., Ltd.
Hokkaido office
At NEXCO EAST Hokkaido Branch (Sapporo City Atsubetsu Ward), we will start replacing the bridge's floor version as an expressway renewal project.
The construction to be carried out this time is E5A Sasson Expressway Bridge Ohno located from Asari IC between Zenibako IC (Oonobashi) of In-bound in line (Otaru direction), Hokkaido of the Expressway for carrying out the construction work to replace the first aging reinforced concrete floor slab to a new deck in We will implement face-to-face traffic control throughout the day.
We apologize for the inconvenience caused by face-to-face traffic during the period, but we ask that you make further efforts to drive safely when traveling in this section.
During construction Homepage for construction, Or traffic information etc. will be posted on the website such as DraPla so please refer to it when using the Expressway.
This work is necessary for safe and secure use of the Expressway, so please understand and cooperate with us.
1 construction section
Sasson Expressway Asari IC and Zenai IC (upper and lower lines)
2 Traffic regulation period and regulations
All-day face to face traffic regulation period From September 5 (Tuesday) to October 15 (Sunday) (41 days) 2017
- Saturday, Sunday and public holidays are also regulated all day.
- The construction period may change depending on the weather and work progress.
3 Traffic restrictions
In the floor slab replacement work, we will reduce the section of each two lanes of up and down lines to one lane and consolidate it into Out-bound lanes and enforce face-to-face traffic control all day. During the several days at the beginning and end of the construction period, all-day overtaking lane restrictions will be imposed on the up and down lines as a preparatory step to switch to two-way traffic regulation.
4 Construction overview
About 46 years have passed since Ono Bridge, which is located between the Asari IC and the Zenikoku IC on the Sasson Expressway, has been cracked due to an increase in wheel load due to the increase in the size of the vehicle and the winter season. The floor slab must be replaced because the concrete floor slab is deteriorated and the reinforcing bars are rusted due to the salt content caused by spraying the antifreeze agent.
In order to replace the concrete floor slab part of the bridge, it is necessary to close the In-bound line (toward Otaru), but one of the 2 lanes of the Out-bound line (towards Sapporo) should be used for the In-bound line (toward Otaru). By carrying out transfer and face-to-face traffic, we will minimize the impact on traffic and carry out construction.
Main work contents
By replacing the deteriorated existing concrete slab with a new slab, it will be reborn as an Expressway that can be used safely and comfortably.
"Reference" Construction status of "reinforcement works of Tohoku Expressway Fujishima pipe inner bridge floor plate" implemented in the spring of 2015
5 Requests for use
- The construction section spans approximately 3km and is reduced from the conventional two lanes on each side to one lane, and one-sided lanes on each side (two lanes up and down) are restricted.
For this reason, the road shoulder is narrow in the one-lane section on one side, so when traveling, please comply with the regulation speed and secure the inter-vehicle distance to be careful of a rear-end collision accident.
Also, as there is a large lane shift in order to shift to the one-lane section on one side, please follow the local information signs. - During the construction period, we will provide construction regulation information as well as call attention to construction regulation information that utilizes information boards, road signs, and simple information boards, and cautions to drive safely. Before riding, please check the above information before riding safely.
- Please check the latest traffic restrictions and traffic jam information before going out.
6 How to obtain road traffic information
(1) Road traffic information that can be obtained before going out
- For the latest regulatory information, see DraTra "Please refer to the.
- NEXCO EAST Road Traffic Information Site "Doratara" (Providing Traffic Information on Highway Nationwide)
[PC]
[Mobile] http://m.drivetraffic.jp/ - NEXCO東日本お客さまセンター (24時間・365日、お客さまの声をお聞きしています)
ナビダイヤル 0570-024-024 または 03-5338-7524 - ハイウェイテレホン (5分毎に更新される交通情報を24時間提供)
札幌局 011-896-1620 旭川局 0166―54―1620
室蘭局 0143-59-1620 帯広局 0155-42―1620
(携帯電話・PHS短縮ダイヤル #8162) - 日本道路交通情報センター(JARTIC)の道路交通情報
050-3369-6760 (北海道地方・高速情報)
インターネット
(2) Road traffic information available while driving
- Road information board
- Highway radio (AM1620kHz)
The section on the highway radio is indicated by the signs on the Expressway. - Highway information terminal
Wide area road information is provided on the monitor screens installed in SA / PA.
- * Twitter's official account "NEXCO EAST (Hokkaido)" (@e_nexco_kita) But information is sent.
Expressway renewal project
Now, bring safety and security to the next generation.
NEXCO EAST will work on updating and repairing highways to deliver safety and security to everyone.
URL: http://www.e-nexco.co.jp/renewal