Notice of night traffic closure on Expressway in Hokkaido
-Road maintenance work, repair work, and wire rope installation work-
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Notice of night traffic closure on Expressway in Hokkaido
June 6, 2017
East Nippon Expressway Co., Ltd.
Hokkaido office
NEXCO EAST Hokkaido Branch Office (Sapporo City Atsubetsu Ward) provides periodic inspections, repair work such as road surface repairs, wire rope installation work to prevent frontal collision accidents in order to make it possible for customers to use expressways safely, securely and comfortably We will carry out nighttime traffic closure with.
For the wire rope trial installation section in NEXCO EAST Tube, March 1, 2017"Temporary two-lane Expressway: Wire rope trial installation section "as well as Attachment [PDF:227KB] Please refer to the.
We apologize for the inconvenience, and we appreciate your understanding and cooperation.
1 closed section and period
Road name | section | period | Main construction contents | Attachment |
---|---|---|---|---|
E5 Do-O Expressway |
Kusagi IC ⇔ Chomanbu IC |
June 19 (Mon) - June 22 (Thu) [4 nights] 20:00 - 6:00 |
Pavement repair work Inspection of various equipment |
Flyer-1 [PDF: 266KB] |
Yakumo IC ⇔ Kusagi IC |
June 19 (Mon) - July 4 (Tue) [12 nights except Saturday and Sunday] 20:00 - 6:00 |
Wire rope installation work Pavement repair work |
||
Ochibe IC ⇔ Yakumo IC |
June 19 (Mon) - July 7 (Fri) [15 nights except Saturday and Sunday] 20:00 - 6:00 |
Wire rope installation work Pavement repair work |
- In case of bad weather, it will be postponed at the same time from the next day.
- Please see the attached leaflet for detours and spare days for postponement.
2 Lamp closure and period
Road name | Location | period | Main construction contents | Attachment |
---|---|---|---|---|
E5A Sasson Expressway |
Sapporo Kita IC (Entrance to the direction of Tomakomai and Asahikawa) |
June 26 (Mon) - July 3 (Mon) [5 nights except Friday, Saturday and Sunday] Every day from 20:00 to 4:00 the next morning |
Sound insulation wall repair work | Flyer-2 [PDF: 141KB] |
3 Main work contents
In order to maintain the roadside living environment, we will replace the deteriorated sound insulation board.
4 Information during the construction period
Construction regulation information is provided through the following media.
- the Internet
- For the latest regulatory information, see DraTra "Please refer to the.
- 『 Drive traffic ] For the latest traffic information.
- Flyers, posters, highway information terminals
Each service area / parking area of toll roads, toll office office, NEXCO EAST Hokkaido branch office each management office etc. distributed and posted. - phone
- 『NEXCO東日本お客さまセンター』
24時間365日、高速道路に関する様々なお問合せにお答えします。
電話番号
0570-024-024 (PHS・IP電話のお客さま:03-5338-7524) - 『ハイウェイテレホン』:リアルタイムの交通情報(5分更新)を24時間提供しています。
電話番号
011-896-1620(札幌)
0166-54-1620(旭川)
0143-59-1620(室蘭)
0155-42-1620(帯広)
(注) おかけ間違いのないようにご注意ください。
「#8162」に携帯電話でおかけいただくと、全国どこでも、その場所から最も近い地域の最新の高速道路状況を自動音声で提供します。 - 『日本道路交通情報センター』:最新の交通情報を提供しています。
電話番号
050-3369-6760
- 『NEXCO東日本お客さまセンター』
- Road traffic information available while driving
- Road information board
- Highway radio (1620kHz)
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.