Expressway traffic during the Golden Week [Hokkaido version]

April 28, 2017 (Fri) - May 7, 2017 (Sun) : 10 days
[Comparison subject April 29, 2016 (Fri) - May 28, 2016 (Sun): 10 days]

  • Corporate Top
  • Press Room
  • Press Release Hokkaido office
  • Expressway traffic during the Golden Week [Hokkaido version]

May 8, 2017
East Nippon Expressway Co., Ltd.
Hokkaido office

NEXCO EAST Hokkaido Branch (Sapporo City Atsubetsu-ku) compiled the traffic conditions of expressways in Hokkaido during the Golden Week as follows.

Traffic overview

  • The number of traffic jams over 1km, 17 times, 5 times less than last year Did.
  • The number of traffic jams over 10km, 3 times and 2 times more than last year Did.
  • The maximum congestion length is On May 3 (Wed) at around 9:45, the road on the eastern road (Chitose direction) headed around Hirouchi tunnel 28.0 km was.
  • The year-on-year change in the average daily traffic volume of the main sections is About 10% increase Did.

1 congestion

[Number of traffic jams]

[2016: April 29 (Fri)-May 8 (Sun)]

 (1) Results for 2017(2) Results for 2016(3) Difference ((1)-(2))
Number of traffic jams during GW period1722▲5
Of which, the number of traffic congestions of 10 km or more31+2
Image of the number of traffic jams during the 2017 GW period

2-day average traffic volume

[Average daily traffic volume during the nine main sections *]

[2016: April 28 (Fri)-May 8 (Sun)]

 (1) Results for 2017(2) Results for 2016YoY (1) / (2)
Average daily traffic volume18,200 units / day16,500 units/day110%

*Detailed daily average traffic volume Attachment [PDF: 55KB] Please refer to the.

[Reference] Past day arrangement

Image of past day arrangement

3 Main traffic congestion points

【Point of occurrence of traffic jam of 5 km or more during the Golden Week period in 2017】

Road nameDirectionTraffic jam date and time (peak)Traffic jam locationCongestion lengthCongestion factors
1E38
DOTO EXPWY
Chitose directionWednesday, May 3, around 9:45Near Hirouchi TN28.0kmTraffic concentration
2E38
DOTO EXPWY
Obihiro directionMay 3 (Wed) around 16:20Near Takinosawa TN19.3kmTraffic concentration
3E38
DOTO EXPWY
Obihiro directionMay 3 (Wed) around 11:35Near Kaede TN15.5kmTraffic concentration
4E38
DOTO EXPWY
Chitose directionMay 6 (Sat) around 16:30Near Karikachi 2nd TN8.7kmTraffic concentration
5E5
Hokkaido road
Tomakomai directionMay 3 (Wed) around 11:00Near Watatsu PA8.6kmTraffic concentration
6E38
DOTO EXPWY
Chitose directionMay 5 (Fri) around 17:05Near Karikachi 2nd TN5.6kmTraffic concentration
7E5A
Sasson Expressway
Tomakomai directionMay 3 (Wed) around 11:00Near Fushiko IC5.0kmTraffic concentration

*IC is interchange, PA is parking area, TN is tunnel

[Reference] Over 5 km of congestion occurred during the Golden Week period of last year (2016)

Road nameDirectionTraffic jam date and time (peak)Traffic jam locationCongestion lengthCongestion factors
1E38
DOTO EXPWY
Chitose directionMay 3 (Tue) around 11: 05Near Hirouchi TN28.5kmTraffic concentration
2E5
Hokkaido road
Tomakomai directionMay 3 (Tue) around 10:40Near Watatsu PA9.0kmTraffic concentration
3E38
DOTO EXPWY
Obihiro directionMay 3 (Tue) around 10:30Near Oyubari TN8.8kmTraffic concentration
4E5A
Sasson Expressway
Chitose directionMay 3 (Tue) around 9:55Near Kariki IC6.8kmTraffic concentration
5E38
DOTO EXPWY
Chitose directionMay 4 (Wed) around 17:45Near Tokachi Shimizu IC5.7kmRoad Closed

*IC stands for interchange, PA stands for parking area, TN stands for tunnel

【reference】
It has implemented an alternative path measures Doto Expressway Shimukappu Tomamu IC ~ Tokachishimizu day traffic volume of the IC of the IC ~ Tokachishimizu IC (traffic counter note) The preliminary value of On Wednesday May 3 (Wed), the largest ever 26,000 vehicles / day have become.

 May 3, 2017May 3, 2016
Daily trafficAbout 26,000 units/dayAbout 22,300 units/day

Note) A traffic counter is an automatic traffic volume measuring device installed on the road.

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.