Expressway traffic during the Bon Festival [Hokkaido version]
From Saturday, August 6, 2016 to Tuesday, August 16, 2016: 11 days [Comparison target Saturday, August 8, 2015 to Tuesday, August 18, 2015: 11 Days]
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Expressway traffic during the Bon Festival [Hokkaido version]
August 17, 2016
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Sapporo City Atsubetsu-ku) has summarized the traffic conditions of the Expressway in Hokkaido during the Obon period as follows.
Traffic volume during one period
- The average daily traffic volume in the main sections (average value of the following 9 main sections) is 20,400 units, 106% of the same period last year have become.
- The daily traffic volume between Tomamu IC and Tokachi Shimizu IC on Doto Expressway reached a record high of 23,300 vehicles on Saturday, August 13.
[Average daily traffic volume during major periods (*1)]
Below, IC indicates interchange, JCT indicates junction, TN indicates tunnel, and BS indicates bus stop.
Unit: vehicle/day
Road name | section | (1) Year 28 | (2) H27 | (1)/(2)(%) |
---|---|---|---|---|
Do-O Expressway | Fukagawa-Takasu Asahikawa | 19,800 | 19,300 | 103% |
Ebetsu East-Iwamizawa | 33,000 | 31,900 | 103% | |
Eniwa-Kitahiroshima | 55,500 | 53,100 | 105% | |
Kokuzai-Ochomanbu | 8,000 | 7,500 | 107% | |
Onuma Park-Forest | 6,400 | 6,100 | 105% | |
Sasson Expressway | Asari ~ Zenkou | 25,600 | 24,100 | 106% |
Doto Expressway (*2) | Chitose East-Oiwake Town | 13,900 | 12,800 | 109% |
Tomamu-Tokachi Shimizu | 15,300 | 14,200 | 108% | |
Book-specific JCT-book-specific | 5,800 | 4,000 | 145% | |
Average daily traffic volume in the above major sections | 20,400 | 19,200 | 106% |
- 1 Traffic volume is the daily average traffic volume for 11 days from H28.8.6 to H28.8.16 based on the preliminary value of the traffic counter [Automatic traffic volume measuring device installed on the road]. (Comparison target is 11 days from H27.8.8 to H27.8.18)
- 2 The Uraboro IC-Shiranuka IC was used on March 29, 2015, and the Shiranuka IC-Akan IC was used on March 12, 2016.
[Reference] Day arrangement between the Obon period of 2016 and the same period of 2015
[Transition of traffic volume during major periods]
(1) Doo Expressway Fukagawa IC-Asahikawa Takasu IC
(2) Doo Expressway Ebetsu East IC-Iwamizawa IC
(3) Doo Eniwa IC-Kitahiroshima IC
(4) Doo-do Kunimi IC-Ochamanbu IC
(5) Hokkaido Expressway Onuma Park IC-Mori IC
(6) Fudaru Do Asari IC-Kenako IC
(7) Doto Expressway Chitose East IC-Oiwake Town IC
(8) Doto Expressway Tomamu IC-Tokachi Shimizu IC
(9) Doto Expressway Honbetsu JCT ~ Honbetsu IC
2 Traffic congestion
- The number of times of traffic congestion is higher than in 2015 1 reduction, 21 times have become.
In addition, for traffic congestion of 5 km or more, compared to H27 Reduced 1 time, 11 times have become. - The longest traffic jam was It occurred in the direction of Chitose between Tomamu IC and Memuro IC on the Doto Expressway on Sunday, August 14th. Due to heavy traffic, it reached 28.5km at the peak (around 17:35), beginning near Karikachi Daiichi TN. It is considered that a large amount of traffic congestion occurred due to the concentration of traffic heading for the direction from Sapporo to the direction of Sapporo in the 14:00 level. The maximum hourly traffic volume in the traffic jam section (between Tomamu IC and Tokachi Shimizu IC) was about 1,200 vehicles per hour at 14:00.
[Number of traffic jams]
Congestion extension | (1) Year 28 | (2) H27 | Difference ((1)-(2)) |
---|---|---|---|
1-5km traffic jam | 10 times | 10 times | 0 times |
Congestion over 5km | 11 times | 12 times | ▲ once |
total | 21 times | 22 times | ▲ once |
[Traffic situation (congestion extension worst 5)]
Road name | Traffic jam location | Traffic jam date and time (peak) | Congestion extension | Cause of traffic jam | |
---|---|---|---|---|---|
1 | DOTO EXPWY | Near Karikachi Daiichi TN (Chitose direction) | Sunday, August 14, around 17:35 | 28.5km | Traffic concentration |
2 | Hokkaido road | Near Kurisawa BS (direction Asahikawa) | Saturday, August 13, around 11:41 | 26.0km | Accident and traffic concentration |
3 | DOTO EXPWY | Near Oyubari TN (Obihiro direction) | Saturday, August 13, around 11:33 | 19.3km | Traffic concentration |
4 | Sasson Expressway | Near Sapporo JCT (Chitose direction) | Saturday, August 13, around 10:20 | 10.3km | Traffic concentration and accident |
5 | DOTO EXPWY | Near Hobetsu TN (Chitose direction) | Sunday, August 14, around 15:18 | 9.8km | Traffic concentration |
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.