Notice of outflow restriction of special vehicles with width of more than 2.5 m due to construction of toll payment machine installation on Expressway in Hokkaido
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Notice of outflow restriction of special vehicles with width of more than 2.5 m due to construction of toll payment machine installation on Expressway in Hokkaido
April 8, 2016
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Atsubetsu Ward, Sapporo City), some lanes at the exits of the Do-O Expressway Eniwa Interchange (IC), Noboribetsu Muroran IC and Date IC will be closed from mid-May due to installation work of the fare adjustment machine. I will let you know.
In addition, we will inform you that special vehicles with a vehicle width of more than 2.5 m cannot flow out at Eniwa IC and Noboribetsu Muroran IC due to this lane closure, during the closing period.
Customers other than special vehicles with a width of more than 2.5 m can flow out of the Expressway from an alternate lane.
We apologize for the inconvenience and ask for your understanding and cooperation.
1 Target exit IC (closed lane) and closing period
Road name | Target exit IC (Closed lane) | Closing period * | Alternative Exit lane | Vehicles that cannot pass |
---|---|---|---|---|
Do-O Expressway | Eniwa IC (General lane) | From Wednesday, May 11 to Thursday, June 30 All day | 1 lane each | Special vehicles with a width of over 2.5 m, Can't get off |
Noboribetsu Muroran IC (General lane) | From Monday, June 20 to Wednesday, August 10 All day | 1 lane each | ||
Date IC (General lane) | From Monday, August 22 to Friday, September 30 All day | Mixed 1 lane |
- Please note that the closing period may be postponed due to stormy weather.
2 Requests and precautions in case of leakage
(1) Customers with special vehicles with a width of more than 2.5 m that are leaked at Eniwa IC or Noboribetsu Muroran IC
Eniwa IC and Noboribetsu Muroran IC, lanes with wider lanes will be closed. For this reason, During the closure period, special vehicles with a vehicle width of more than 2.5 m cannot be disembarked at Eniwa IC or Noboribetsu Muroran IC. Please use the front and rear ICs while the lane is closed.
(2) Customers of ETC vehicles leaked at Date IC
At Date IC, during the closing period, during normal timesThe exit lane operating asSince it will be operated as a mixed lane, if the previous car is a regular car, it will stop once when paying. Please check ahead and slow down to prevent a rear-end collision.
Introducing location and scheduled time of charge adjustment machine
Currently, there are 62 toll gates on the Expressway in Honshu under our jurisdiction. This is the first time it has been introduced to Hokkaido, Operations are scheduled to start sequentially this summer.
It is planned to be introduced sequentially into the next four interchanges (ICs) by 2017
Details will be announced later.
Introduction IC (time of introduction) | ||
---|---|---|
2016〇 | Do-O Expressway | Eniwa IC (around summer), Noboribetsu Muroran IC (around summer), Date IC (around autumn) |
2017〇 | Doto Expressway | Shimukappu IC (around summer) |
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.