Comfortable drive forecast for Obon period [NEXCO EAST version]

~The peak of traffic congestion is predicted to be 10th and 11th of August on the Out-bound line and 14th and 15th of August on the In-bound line~

  • Corporate Top
  • Press Room
  • Press Release Headquarters
  • Comfortable drive forecast for Obon period [NEXCO EAST version]

July 12, 2013
East Nippon Expressway Co., Ltd.

NEXCO EAST (Chiyoda-ku, Tokyo) has summarized traffic congestion prediction and countermeasures due to traffic concentration during the Obon period [August 8 (Thu)-August 18 (Sun): 11 days].

1 Request for distributed use

  • This traffic congestion forecast is based on the traffic conditions of the past Bon Festival, New Year holidays, and Golden Week.
  • The number of traffic jams during the Obon period (more than 10 km at peak) 161 times, 11 times more than 150 times the previous year It is a forecast.
    ・ Out-bound line 64 times: +7 times (57 times last year), In-bound line 97 times: +4 times (previous year 93 times) * Previous year (H24.8/9-8/19: 11 days)
  • Congestion trends during the Obon period Saturday 10th and 11th Sunday on the Out-bound line, Wednesday 14th and 15th Thursday on the In-bound line We anticipate that there will be a lot of traffic congestion. [Traffic occurrence tendency is as shown below]
  • Prediction of the longest traffic jam in NEXCO EAST (Congestion prediction of maximum congestion length of 20 km or more is Attachment 1 [PDF: 375KB])
    ・ Out-bound: August 13 (Tue), near the Kan-Etsu Expressway Higashimatsuyama Interchange (Higashimatsuyama City, Saitama Prefecture) About 40km
    ・ In-bound: Friday, August 16th, near the Kosaka Kan-Etsu Expressway service area (Higashimatsuyama City, Saitama Prefecture) About 35km
  • Please avoid using traffic congestion by shifting the departure time of customers before and after the time when peak traffic congestion is expected.
Image of traffic congestion prediction

[Comparison of the number of traffic jams during the past Bon Festival]

Traffic jam scale2013 (forecast)
(H25.8/8 ~ 8/18)
2012 (actual)
(H24.8/9 ~ 8/19)
2011 (actual)
(H23.8/11-8/21)
10km or more161 times150 times130 times

2 Initiatives for congestion measures

Based on the current traffic congestion forecast and the traffic congestion period (Obon, New Year holidays, Golden Week, etc.) so far, we will implement the following efforts during the period when we predict particularly heavy congestion. ( Attachment 2 [PDF: 524KB] )

  • Initiatives in the main line
    -In-bound speed decrease caution in slope, etc.
    ・ Calling attention to the end of the traffic jam
  • Efforts at rest facilities
    ・Parking staff arrangement
    ・Secure large vehicle parking
    ・Installation of temporary toilet
Such

Notice

  • Expressway traffic information service "Drive Traffic (DraTra)" (Attachment 3 [PDF: 846KB])
    Expressway the offers on the Internet, such as real-time road traffic conditions and congestion prediction information. It can be viewed from a computer, tablet, mobile phone, or smartphone terminal.
    DraTra a Expressway traffic information service provided by NEXCO EAST
    Smartphone/tablet
    (Http://www.drivetraffic.jp/smp/)
    mobile phone
    (Http://m.drivetraffic.jp/)
    Please use.
    • When you access "DraTra", the top page tailored to your device will be displayed. However, please note that the PC page may be displayed depending on the device.
  • Expressway are different from ordinary roads. You need to be well prepared and moderately tense when riding.
    Do you know ~? Expressway knows how - when you use (Attachment 4 [PDF: 190KB])

Related press release

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.