Congestion prediction and countermeasures on Expressway during the Obon season [national version]

~ Distributed use to alleviate congestion. Strengthening measures for traffic concentration ~

  • Corporate Top
  • Press Room
  • Press Release Headquarters
  • Congestion prediction and countermeasures on Expressway during the Obon season [national version]

July 16, 2010
East Nippon Expressway Co., Ltd.
Central Japan Expressway Co., Ltd.
West Japan Expressway Co., Ltd.
Honshu-Shikoku Expressway Co., Ltd.

"East/middle/west Japan (NEXCO3 company)/JB Motoshi Expressway is Obon [14 days from Thursday, August 5, 2010 to Wednesday, August 18, 2010] Expressway] on traffic congestion prediction and countermeasures.

1 Request for distributed use

  • Congestion on the Obon is heavy when the Out-bound line is from Thursday, August 12th to Sunday, August 15th, and on the In-bound it is from Friday, August 13th to Monday, August 16th. I am predicting. (See the figure below)
  • This traffic congestion forecast is based on the actual traffic volume increase and traffic congestion conditions that were confirmed during the heavy traffic seasons such as the Bon Festival last year, the year-end and New Year holidays, and this year's Golden Week as the effect of special discounts for holidays.

[Prediction of the longest traffic congestion by vertical line]

IC: Interchange, JCT: Junction, TN: Tunnel

Road name
(direction)
Congestion peak
Date and time (forecast)
Traffic jam
Point
locationTraffic jam section
(End IC

IC on the top side)
Peak time
Congestion length
(Km)
Normal time
Passing
time
Traffic jam
peak
Time passage
time
company name
Kan-Etsu Expressway)
(Out-bound line)
from Tokyo)
Niigata direction
Friday, August 13
Around 7:00
Hanazono IC
near
Saitama
Fukaya
Tokorozawa IC

Hanazono IC
45km0:301:30East Japan
Tomei Expressway)
(Out-bound line)
from Tokyo)
Nagoya direction
Saturday, August 7
Around 10:00
Yoshida IC
near
Shizuoka Prefecture
Haibara-gun
Yoshida Town
Fuji IC

Yoshida IC
40km0:251:40Central Japan
Chinese road
(Out-bound line)
From Osaka
Hiroshima direction
Friday, August 13
Around 1:00
Takarazuka East TN
near
Hyogo prefecture
Takarazuka
Meishin Expressway
Kyoto South IC

Chinese road
Nishinomiya Yamaguchi JCT
40km0:303:20Western Japan
Tohoku Expressway
(In-bound line)
From Sendai
Tokyo direction
Saturday, August 14
Around 18:00
Monday, August 16
Around 0:00
Fukushima TN
near
Fukushima Prefecture
Fukushima
Shiraishi IC

Nihonmatsu IC
40km0:251:40East Japan
Tomei-handou
(In-bound line)
From Ise
Nagoya direction
Saturday, August 14
Around 18:00
Yokkaichi IC
near
Mie Prefecture
Yokkaichi
Hisai IC

Yokkaichi IC
40km0:301:40Central Japan
Kyushu Road
(In-bound line)
From Kumamoto
Moji direction
Sunday, August 15
Around 19:00
Hirokawa IC
near
Fukuoka Prefecture
Yame District
Hirokawa Town
Ueki IC

Hirokawa IC
40km0:252:00Western Japan

[Number of daily congestion occurrences predicted to peak at 10 km or more] Total 596 times

[Number of daily congestion occurrences predicted to peak at 10 km or more] Total 596 image images

Comparison of the number of traffic jams with Obon last year [H21: 8/6 (Thurs)-8/19 (Wed) *Including impact of accidents, etc.]

Traffic jam scale(1) 2010 Bon Festival(2) 2009 Bon FestivalDifference ((1)-(2))
totalgoing downgoing uptotalgoing downgoing uptotalgoing downgoing up
Number of traffic jams over 10km596 times230 times366 times546 times218 times328 times+50 times+12 times+38 times
Number of traffic jams over 30km46 times17 times29 times56 times28 times28 times▲ 10 times▲11 times+1 time

Due to the Tomei traffic closure due to the Suruga Bay earthquake, the number of traffic jams in 2009 was less than expected (704 traffic jams over 10 km).

H22_nendoobonkikan'no Expressway main congestion (peak congestion length 30km or more) in the [PDF: 136KB]

2 Plan for congestion measures

Based on the situation of congestion forecasts and last year traffic congestion period (GW, Bon Festival, year-end and New Year holidays, etc.), especially severe congestion during the period in which to predict, In-bound speed decrease caution in the slope or the like, the dark by the illumination up of tunnel lighting We are planning to implement measures against congestion, such as alleviating the feeling of pressure and pressure, alerting the rear end of the traffic jam, arranging parking lot organizers at rest facilities, installing temporary toilets, and securing large vehicles.

ItemsMain measuresunitMeasured quantity of each company 
4 companies
total
NEXCO
East Japan
NEXCO
Central Japan
NEXCO
Western Japan
JB
Four
high speed
Main line section(1) In-bound reminder the rate of decrease in the slope, etc.Location661012910206
(2) Relieving darkness and oppressive feeling by increasing the illumination of tunnel lightingLocation65701052242
(3) Calling attention to the rear end of a traffic jamLocation1899411315411
SAPA(4) Placement of parking lot organizers at rest facilitiestotal
People/day
4,5693,6762,11419210,551
(5) Installation of temporary toiletBasis29233624637911
(6) Secure parking for large vehiclesLocation97634913222
In-bound speed reduction caution in slope or the like, images of the relaxation of the dark and oppressive feeling due to the illuminance-up of the tunnel lighting
Image of warning of rear-end collision in the traffic jam, arrangement of parking lot organizers at rest facilities, etc.
Image image of temporary toilet installation and securing of parking for large vehicles
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.