Trial introduction of pre-bid price negotiation method

May 31, 2007
East Nippon Expressway Co., Ltd.

 NEXCO東日本(東京都千代田区、代表取締役会長:八木重二郎)では、より一層のコスト縮減などを進めるため、入札前価格交渉方式を試行的に導入します。

Purpose of introduction

By conducting technical negotiations for each item in the quotation before bidding, we will further reduce costs and increase the transparency and fairness of quotation negotiations.

System overview

Before bidding, we will ask bidders to submit an estimate, and we will conduct bidding after conducting technical negotiations so that the performance and functions of the construction object can be realized optimally and inexpensively.

Image image of system overview

Target construction

Works targeted for the following conditions:

  • Of the "Tunnel emergency equipment construction", "Power distribution equipment construction", "Remote monitoring and control equipment construction", "Traffic information equipment construction", "Tunnel ventilation equipment construction", "Machine equipment construction" Main construction
  • When setting a contract limit price, it is difficult to comply with the accumulation standards, and there is a large proportion of things that must be set based on an estimate.

Construction introduced by trial

It will be introduced on a trial basis by the following construction in which the Kanto Regional Head Office will announce the tender as of June 1, 2007.

  • Kanto Regional Head Office ETC equipment expansion work
  • Kanto Regional Head Office jurisdiction radio equipment construction