[C3] Gaikan Expressway NIIKURA closure due to the PA refresh construction work has ended at December 14 (Friday) 23
~ Thank you for your understanding and cooperation for the construction ~
- Corporate Top
- Notice
- Important notice to customers
- [C3] Gaikan Expressway NIIKURA closure due to the PA refresh construction work has ended at December 14 (Friday) 23
December 18, 2018
East Nippon Expressway Co., Ltd.
Tokyo Outer Ring Construction Office
NEXCO EAST Tokyo Outer Ring Construction Office (Nerima-ku, Tokyo) C3 Gaikan Expressway (hereinafter “Outer Ring Road”) In the new warehouse parking area (hereinafter “Arakura PA”), we closed the Arakura PA for refresh work, but for one day than planned The construction was completed early and the closure of Arakura PA was released at 23:00 on Friday, December 14th. Please note that the alternative facilities (off-street parking lots and temporary toilets) that were installed during the closed period are no longer available. In addition, when using an alternative facility, the transfer adjustment that was carried out when it re-flowed into the outer ring road from the Wako Kita IC entrance inside and outside within a certain period of time, has also been completed.
We apologize for any inconvenience caused by the closure of the rest facility during the construction period. Thank you for your understanding and cooperation for the construction work.
1 Construction content
We carried out pavement repair work for "Araikura PA", "pavement removal/laying, road marking, etc.", improvement of guide signs for parking spaces, and repair of toilets.
In addition, a belt conveyor was installed in the PA to transport the earth and sand generated by the construction work of the outer ring road of Tokyo (Kanetsu to Tomei).
2 Construction period
From September 18 (Tue), 2018 to December 14 (Fri), 2018
3 Construction status photo
- Refreshing construction status (paving repair-parking area)
- Refreshing construction status (paving repair-ramp section)
- Status of refresh work (toilet repair)
- Belt conveyor installation work status
- Due to the installation of the belt conveyor, there are some places where the use in the parking lot etc. is restricted.
We apologize for any inconvenience caused and appreciate your understanding and cooperation.
4 Future work schedule
On the outer ring road, we will continue to install belt conveyors between Oizumi JCT and Wako Kita IC this year with night lane regulations. Thank you for your understanding and cooperation.
Tokyo Outer Ring Project Home Page