Revision of design change guidelines

July 1, 2016
East Nippon Expressway Co., Ltd.

East Nippon Expressway Co., Ltd. has revised the "Civil Engineering Common Specifications", and has revised the "Claim target table reference breakdown" for "Design change guide run in civil engineering contract contracts". ..

See below for details.



There are no revisions to the design change guidelines for research contracts.

For other initiatives This [PDF: 224KB]

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.