[E46] Akita Expressway both inbound and outbound, Yuda IC to Yokote IC
Nighttime road closure notice

August 26th (Monday) to September 6th (Friday) 8pm to 6am the following morning
~We will carry out pavement repair work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E46] Akita Expressway Yuda IC to Yokote IC, nighttime road closures

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 507KB]

July 29 2024
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita Management Office

NEXCO EAST The Akita Management Office (Akita City, Akita Prefecture) will close the E46 Akita Expressway (hereinafter referred to as "Akita Road") from the Yuda Interchange (hereinafter referred to as "IC") to the Yokote IC on the up and down lines during the night to allow for pavement repair work.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation in allowing extra time for your trip.

1. Closed section and date and time

  1. Restricted area
    Akita Expressway, Yuda IC to Yokote IC
  2. Image image of closed section
    Geographical Survey Institute (Geographical Survey Institute) Processed by East Japan Expressway Co., Ltd.
    • The signs such as E46 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and Time
    Akita Expressway, Yuda IC to Yokote IC
    Implementation date:
    August 26th (Monday) to 29th (Thursday), September 2nd (Monday) to September 6th (Friday) 2024
    Every night from 8pm to 6am the next morning
    Preparation day:
    September 9th (Monday) to September 13th (Friday) 2024
    Every night from 8pm to 6am the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • Parking areas (hereinafter referred to as "PA") within the road closure sections will be closed as follows:
    Akita Expressway Yamauchi PA, both inbound and outbound lanes
    8pm to 6am the next morning
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to Appendix 1 [PDF: 177KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Regarding transit adjustments due to suspension of traffic

For customers who temporarily leave Expressway due to road closures, detour through the closed section, re-enter and transfer in the forward direction, we will implement a "transfer adjustment" in which the toll fee will be adjusted according to the section used. Masu. (See Attachment 2 [PDF: 132KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.
  • Nishisenboku Smart IC can only be used by ETC vehicles, but it is closed from 10pm to 6am the following day.
  • Only vehicles with ETC can use Yokote Kita Smart IC.

Four. Construction overview

On the Akita Expressway Upper and Lower Lines Yuda IC ~ Yokote IC, the road surface is damaged, so pavement repair work will be carried out. In order to minimize inconvenience to our customers, we will close the road at night on weekdays when traffic is low, and carry out construction intensively and efficiently. This is necessary for the safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Image after pavement repair
Image after pavement repair

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.