[E13] Tohoku-Chuo Expressway both directions Nanyo Takahata IC to Kaminoyama Onsen IC
Nighttime road closure notice

July 16th (Tue) to July 24th (Wed) 20:00 to 6:00 the next morning
~ Construction work to install partition fences will be carried out ~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E13] Tohoku Tohoku-Chuo Expressway southbound lanes: Notice of nighttime road closure between Nanyo Takahata IC and Kaminoyama Onsen IC

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 613KB]

June 18 2024
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Yamagata Management Office

NEXCO EAST The Yamagata Management Office (Yamagata City, Yamagata Prefecture) will be closing the road for the night due to construction work to install a demarcation fence at the Nanyo-Takabatake Interchange (hereafter "IC") to Kaminoyama Onsen IC on the E13 Tohoku-Chuo Expressway (hereafter "Tohoku Chuo Road") up and down line.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation in allowing extra time for your trip.

1. Closed section and date and time

  1. Closed section:
    Tohoku Chuo Expressway, both inbound and outbound lanes, between Nanyo Takahata IC and Kaminoyama Onsen IC
  2. Image image of closed section
    Geographical Survey Institute (Geographical Survey Institute) Processed by East Japan Expressway Co., Ltd.
    • The signs such as E13 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    Implementation date:
    July 16th (Tuesday) to July 24th (Wednesday) 2024
    Every day from 20:00 to 6:00 the next morning (excluding Saturdays, Sundays, and holidays)
    Preparation day:
    July 25th (Thursday) to July 29th (Monday) 2024
    Every day from 20:00 to 6:00 the next morning (excluding Saturdays, Sundays, and holidays)
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to Appendix 1 [PDF: 191KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Regarding transit adjustments due to suspension of traffic

For customers who exit Expressway due to a road closure, detour around the closed section, then re-enter and transfer in the forward direction, a "transfer adjustment" will be implemented in which the toll fee will be adjusted according to the section used. (See Appendix 2 [PDF: 165KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.
  • Yamagata PA Smart IC is only available for vehicles with ETC.

Four. Construction overview

On the Tohoku Chuo Expressway Upper and Lower Lines Nanyo Takahata IC ~ Kaminoyama Onsen IC, a section fence will be installed in the tunnel of the temporary two-lane section as a measure to prevent head-on collisions. In order to minimize inconvenience to our customers, we will close the road at night on weekdays when traffic is low, and carry out construction intensively and efficiently. This is necessary for the safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

Photo before installation of partition fence
Before installation of partition fence
Photo of the image after installing the partition fence
Image after installation of partition fence

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.