[E6] Joban Expressway Up and Down Line Joban Tomioka IC - Shinchi IC
Notice of night traffic closure

June 21 (Fri) - June 27 (Thu), July 3 (Wed) - July 11 (Thu), July 12 (Fri) - July 19 (Fri)
Weekdays from 8pm to 5am the next morning
~We will carry out pavement repair work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Joban Expressway Up and Down Line Joban Tomioka IC - Shinchi IC Notice of nighttime traffic closure

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 602KB】

May 21 2024
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Iwaki Management Office

NEXCO EAST Iwaki Management Office (Iwaki City, Fukushima Prefecture) will be implementing night-time road closures on both inbound and outbound lanes of the E6 Joban Expressway (hereinafter referred to as the "Joban Expressway") from Joban Tomioka Interchange (hereinafter referred to as the "IC") to Shinchi IC to carry out pavement repair work and other works.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. Closed section and date and time

  1. Closed section:
    [1] Joban Expressway northbound and southbound lanes, Joban Tomioka IC to Namie IC
    [2] Joban Expressway both inbound and outbound lanes, Minamisoma IC to Soma IC
    [3] Joban Expressway inbound and outbound lanes, Soma IC to Shinchi IC
  2. Image image of closed section
    Geographical Survey Institute (Geographical Survey Institute) Processed by East Japan Expressway Co., Ltd.
    • Attached to each line E6 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    • [1] Joban Expressway inbound and outbound lanes, Joban Tomioka IC to Namie IC
    • Implementation date:
      June 21st (Friday) to June 27th (Thursday) 2024
      8:00pm to 5:00am the next morning (excluding weekends and holidays)
      Preparation day:
      June 28th (Friday) to July 2nd (Tuesday) 2024
      8:00pm to 5:00am the next morning (excluding weekends and holidays)
    • [2] Joban Expressway both directions: Minamisoma IC to Soma IC
    • Implementation date:
      2024- Thursday, July 11, 2020
      8:00pm to 5:00am the next morning (excluding weekends and holidays)
      Preparation day:
      July 22nd (Monday) to July 31st (Wednesday) 2024
      8:00pm to 5:00am the next morning (excluding weekends and holidays)
    • [3] Joban Expressway inbound and outbound lanes, Soma IC to Shinchi IC
    • Implementation date:
      2024- Friday, July 19, 2020
      8:00pm to 5:00am the next morning (excluding weekends and holidays)
      Preparation day:
      July 22nd (Monday) to July 31st (Wednesday) 2024
      8:00pm to 5:00am the next morning (excluding weekends and holidays)
Image of date and time
Legend image image 1
Legend image image 2
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • Service areas (hereinafter referred to as "SA") located within the road closure sections will be closed as follows:
    Minamisoma Kashima SA on Joban Expressway inbound and outbound)
    8pm to 5am the next morning
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to Appendix 1 [PDF: 368KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Regarding transit adjustments due to suspension of traffic

For customers who exit Expressway due to a road closure, detour around the closed section, then re-enter and transfer in the forward direction, a "transfer adjustment" will be implemented, in which the toll will be adjusted according to the section used. (See Appendix 2 [PDF: 407KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.

Four. Construction overview

On Joban Expressway inbound and outbound lanes, we will be carrying out pavement repair work and traffic volume measurement equipment renewal work. In order to minimize inconvenience to customers, we will close the roads at night on weekdays when traffic volume is low, and carry out the work in a concentrated and efficient manner. This work is necessary to ensure that you can use Expressway safely and comfortably, so we ask for your understanding and cooperation.

Photo of pavement repair work
Pavement repair work photos
Image of traffic volume measurement equipment renewal work
Traffic volume measurement equipment renewal work photos

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.