[E6] Joban Expressway between Shinchi IC and Yamamoto IC (upper and lower lines)
Implementation of nighttime closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Joban Expressway IC-Yamamoto IC (upper and lower lines) Night traffic closure

The latest regulatory information isDraTraPlease see.

PDFバージョン【PDF:996KB】

September 16, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Sendai Higashi Management Office

NEXCO EAST Sendai Higashi Management Office (Wakabayashi Ward, Sendai City) is located between E6 Joban Expressway Shinchi Interchange (IC) and Yamamoto IC (upper and lower lines) in a temporary 2-lane section (one lane on one side). , Road closures will be implemented at night as follows due to lane switching work associated with pavement repair work and disaster recovery work.
Therefore, when you go out, please leave with plenty of time and take a detour to National Route 6 etc. when driving.
We apologize for the inconvenience caused to customers using the Expressway, but we ask for your understanding and cooperation in the construction necessary for safe and comfortable use of the Expressway.

1. Closed section

 常磐自動車道 新地IC~山元IC間(上下線)
別添資料-1【PDF:289KB】

(Location map)
Image of (position map)

2. Closed date and time

 常磐自動車道 新地IC~山元IC間(上下線)
 令和4年10月11日(火)~18日(火)
 20時~翌5時【6夜間】
 【予備日:10月19日(水)~24日(月)】

  • Lane operation change period October 19, 2020 (Wednesday) to late November (planned) All day
  • Nighttime traffic closures are from 8:00 p.m. to 5:00 a.m. on weekdays.
    (Friday night traffic will be closed until 5:00 on Saturday morning.)
  • It may be canceled due to weather, etc., so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days
Date and time of road closure Image image of the legend

3. Detour

 国道6号、県道113号(別添資料-1【PDF:289KB】

Four. Construction content

1. Pavement repair work (we repair damaged pavement.)

Photo before repair
Before repair
Photo after repair (image)
After repair (image)

2.災害復旧工事に伴う車線運用の切り替え作業を行います。

Road closure construction details Image image of the legend
  1. Current status
    (1) Image of the current situation

    10/11~18 20:00~翌5:00 夜間通行止め時に(1)から(2)への切り替え作業を行います

  2. 車線運用変更 10/19 5:00~11月下旬予定※
    (2)車線運用変更 10/19 5:00~11月下旬予定のイメージ画像
  3. 通常の車線運用 11月下旬予定※
    (3)車通常の車線運用 11月下旬予定のイメージ画像
  • The lane operation change timing may change depending on the progress of disaster recovery work. We will inform you separately when there is a change.

Five. Regarding transit fare adjustment due to suspension of traffic

Attachment-2 [PDF: 123KB]

For passengers who leave the Expressway once due to a nighttime suspension and bypass the closed section and transfer again in the same direction, we will make a "transit adjustment" to adjust the toll according to the section used.

6. How to obtain traffic information

  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.