[2nd] Winter tire installation rate is still 30%! Replace tires early

-Results of winter tire installation status survey (2nd report)-

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [2nd] Winter tire installation rate is still 30%! Replace tires early

November 15, 2018
East Nippon Expressway Co., Ltd.
Tohoku office

NEXCO EAST Tohoku Branch (Sendai-shi Aoba-ku), aiming at the early winter tire replacement, will aim to raise a safe driving of snow road driving, in the coming snowfall period, for winter use on expressway We will investigate the mounting condition of the tire and announce the result.

The installation rate of winter tires in Tohoku as a whole is 30%, which is higher than the previous survey (17%).

In normal years, the possibility of snowfall tends to increase from this week, so Please change to early winter tires and drive safely when using the Expressway.

1 November 12th (Mon) Survey Results (2nd)

Survey location Winter tire installation rate Number of surveys this time JMA observation data
This time survey
(November 12)
Last survey
(November 5)
Winter tires
Number of installed
Total number First snow day
(Observation point)
Aomori Prefecture E4 Tohoku Expressway Aomori IC 55% 31% 31 56 Last year: November 16 (Aomori City)
This year: unobserved
Normal year: November 6
E4A Hachinohe Expressway Hachinohe IC 31% 11% 14 45
Aomori prefecture total 45% 22% 45 101
Iwate Prefecture E4 Tohoku Expressway Morioka Minami IC 49% 31% 77 157 Last year: November 16 (Morioka City)
This year: unobserved
Normal year: November 8
E4 Tohoku Expressway north Ezuriko IC 20% 28% 18 91
Iwate prefecture total 38% 30% 95 248
Miyagi Prefecture E4 Tohoku Expressway Sendai Miyagi IC 32% 23% 31 98 Last year: November 19 (Sendai City)
This year: unobserved
Normal year: November 24
E6 Sendai-Tobu Road Tobu Road Sendai Higashi IC 32% 7% 35 109
Miyagi prefecture total 32% 15% 66 207
Akita E4 Tohoku Expressway Towada IC 40% twenty four% 12 30 Last year: November 16 (Akita City)
This year: unobserved
Normal year: November 13
E7 Akita Expressway Akita Minami IC 28% 9% 17 60
E46 Akita Expressway Yokote IC 30% 10% 26 88
Akita prefecture total 31% 11% 55 178
Yamagata Prefecture E48 Yamagata Expressway Yamagata Kita IC 37% twenty four% 20 54 Last year: November 16 (Yamagata City)
This year: unobserved
Normal year: November 18
E48 Yamagata Expressway Tsuruoka IC 19% 22% 5 27
Yamagata total 31% twenty four% 25 81
Fukushima Prefecture E4 Tohoku Expressway Fukushima Iisaka IC 31% 12% 38 124 Last year: November 19 (Fukushima City)
This year: unobserved
Normal year: November 26
E4 Tohoku Expressway Koriyama IC 29% 19% 62 211
E49 Ban-Etsu Expressway Aizuwakamatsu IC 27% twenty four% 30 113
E6 Joban Expressway Iwaki Central IC 15% 3% 28 193
Fukushima Prefecture total twenty five% 13% 158 641
Tohoku Regional Head Office 30% 17% 444 1,456
  • Survey method: Visually check the tire type of the vehicle passing through the general lane at the toll gate. (About 3 hours each time)
  • "IC" is an abbreviation for interchange.
  • About the first snow day, it is the information as of the survey date.

The next survey is scheduled for November 19th (Monday) (announced on November 21st (Wednesday)).
(The survey date and publication date are subject to change without notice due to weather and other reasons.)
This document is a press release "Results of the winter tire installation status survey (1st) -Winter tire installation rate 17%, winter is just around the corner! Early tire replacement- (November 7, 2018) ) ”Is a continuous survey.

2 Request from NEXCO EAST Tohoku Branch

  • Please put on early winter tires before snowfall.
    Summer tires tend to slip on snowy roads, and slip accidents on winter roads can lead to serious accidents, so please replace them with winter tires early.
  • "Driving slowly and safely on snowy roads" please. Reference Material-1 [PDF: 189KB]
    When driving on a snowy road at the beginning of the season, the feeling of safe driving on the snowy road may not be restored. Please do not operate suddenly and operate slowly and safely.
  • "Frequently gathering information before and after going out" please. Reference Material-2 [PDF: 1.4MB]
    The weather on winter Expressway changes rapidly, so be sure to check the road and weather information before and during your trip.

In order to use the winter highway safely, securely and comfortably, NEXCO EAST enlightenment activities at SA, PA, IC, traffic safety campaign, "Drupa" HP 's winter highway We actively send out information such as lectures ".

  • Dr. Mammoshi: A researcher who specializes in car and snow road safety
Image of Dr. Mammoshi
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.