[E7] Nihonkai-Tohoku Expressway (between Akita Airport IC and Iwaki IC)
Implementation of nighttime traffic closure and alternate traffic regulation on one side

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E7] Nihonkai-Tohoku Expressway (between Akita Airport IC and Iwaki IC) Nighttime traffic closure and alternate traffic control on one side

August 6, 2018
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita Management Office

NEXCO EAST Akita Management Office (Akita City, Akita Prefecture) is a 2-lane section (1 lane on each side) E7 Nihonkai-Tohoku Expressway Between Akita Airport Interchange (IC) and Iwaki IC, we will close the bridge at night to repair bridge accessories, etc. .)

This work is necessary to use the Expressway safely and comfortably. We will do our best to minimize the inconvenience to our customers, and we ask for your understanding and cooperation.

1 closed section

[1] Nihonkai-Tohoku Expressway Akita Airport IC-Iwaki IC (upper and lower lines)

2 One side alternate traffic regulation section

Nihonkai-Tohoku Expressway Akita Airport IC-Iwaki IC (upper and lower lines)

[2] 16.0KP ~ 16.6KP (600m)
[3] 12.6KP ~ 14.8KP (2,200m)

  • KP is Kilopost (distance display from Kawabe JCT (Nihonkai-Tohoku Expressway base point)).

3 Traffic regulation period

Night traffic

[1] September 3, 2018 (Monday) -September 28 (Friday), every night from 21:00 to 6:00 the following day
(Preliminary days: Monday, October 1, 2018 to Friday, October 19)

  • As a general rule, there are no restrictions on Saturdays, Sundays and public holidays.

Alternate traffic control on one side

[2] [3] September 3, 2018 (Monday) -September 14, 2018 (Friday) 6:00 to 21:00 daily
(Preliminary days: Tuesday, September 18, 2018 to Friday, October 19)

  • As a general rule, there are no restrictions on Saturdays, Sundays and public holidays.
  • The maximum waiting time is 15 minutes.
    Only one of [2] and [3] will be regulated.
Image of closed hours

4 Detour

National Route 7, Prefectural Road 61, Prefectural Road 65, Prefectural Road 56, Prefectural Road 44 [ Attachment-1 [PDF: 233KB] ]

5 Construction content

Bridge expansion and contraction device replacement work (other pavement repair work, bridge inspection, normal maintenance work, etc.)

Image of damage situation (Kimiganobashi)
Image of damage situation (Katsutegawabashi)

6 Information provision

Although it will be light rain, it will be postponed if there is a possibility of heavy rain and strong wind.
The decision on whether or not to close at night will be made by 16:00 pm on the day of the implementation.

  • "DraPla", a site full of useful information on Expressway across Japan
    【address】
    PC version
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター(24時間365日オペレーターが応対いたします。)
    【電話番号】 0570-024-024 または 03-5338-7524
  • ハイウェイテレホン (電話でリアルタイムの交通情報(5分更新)を24時間入手できます。)
    【電話番号】
    秋田局 TEL 018-826-1620 携帯電話・PHSからは「#8162

* Twitter official account "NEXCO EAST (Tohoku)" ( @E_nexco_tohoku ) Also delivers information.

Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.