【E13】 National Highway No. 13 (Nanyo Bypass) along the construction of Tohoku-Chuo Expressway Intersection of Midorimachi - Nankanoku intersection Nighttime traffic closure notice

~ Construction of a bridge construction by a large special bogie ~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • 【E13】 National Highway No. 13 (Nanyo Bypass) along the construction of Tohoku-Chuo Expressway Intersection of Midorimachi - Nankanoku intersection Nighttime traffic closure notice

PDF version [PDF: 1021KB]

June 25, 2018
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Yamagata Construction Office

NEXCO EAST Tohoku Regional Head Office Yamagata Construction Office (Yamagata City, Yamagata Prefecture) E13 TNortheast Central Expressway Nanyo Takahata Interchange (IC) ~ Yamagata Kamiyama With the construction between ICs,E13 Because of the construction work of the bridge where the northeast central highway and the national highway No. 13 (Nanyo bypass) intersect, we will implement a nighttime traffic stop in a section of national highway No. 13 (Nanyo bypass). Although traffic congestion accompanying this road closure is not predicted, when you go out, please check on the road information etc. and go out

People living along the roadside and people using National Route 13 (Nanyo Bypass) are very much troubled, but we will work to minimize inconvenience, so please understand and Thank you for your collaboration..

1 closed section

National Highway No. 13 (Nanyo Bypass)
Midoricho intersection-Fukanuma intersection
Extension: Approximately 2.3 km
Address: Fukanuma, Takahata-cho, Higashiokitama-gun, Yamagata Prefecture
Location diagram: See diagram to the right

(Detail is Attachment 1 [PDF: 222KB] Please refer to)

Image of Geographic Map
Geographic Institute map ( Geographical Survey Institute ), Processed by East Japan Expressway Co., Ltd.

2 closed days

period July 9 (Mon), 2018 - July 17 (Tue)
Preparation day July 10 (Tue), 2018 - July 12 (Thu)
July 18 (Wed), 2018 - July 20 (Fri)
Time From 20:00 to 6:00 the next day

Construction period calendar (July)

Image of construction period calendar (July)

  • In case of stormy weather, the work will be postponed.
  • The decision to close the road will be made at 17:00 in the evening.

3 detour

National Highway No. 113, National Highway No. 399, Nanyo City Road Details Attachment 1 [PDF: 222KB]

4 Construction details

Northeast Chuo Road Nanyo Takahata IC ~ Yamagata Kamiyama With the construction of the IC, construction of the Takahata deep-numa bridge (tentative name) located at the intersection of the northeastern central road and national highway 13 will be carried out. To ensure the safety of those using National Highway No.13, we will implement a road closure. Detail is Attachment 2 [PDF: 594KB] Please refer to.

5 Information provision

  • NEXCO東日本お客さまセンター
    0570-024-024 または 03-5338-7524
  • 日本道路交通情報センター(JARTIC)の道路交通情報
    全国共通ダイヤル 050-3369-6666(携帯電話短縮ダイヤル#8011)
    050-3369-6606(山形局)
    インターネット
  • Road information board (national road)
  • VICS (available in VICS compatible car navigation etc.)

6 Efforts to minimize inconvenience to customers due to construction

[Strengthening of information provision]

n addition to the national highway information board (Electric bulletin board), we plan a signboard near Nanyang Bypass (between Midori-morinuma) and a leaflet nearby, we will notify you in advance.

Image of flyer
GET ADOBE READER

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.