[E6] Joban Expressway (between Yamamoto IC and Iwanuma IC)
Announcement of proximity work associated with 4-lane construction

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Joban Expressway (between Yamamoto IC and Iwanuma IC) Notice of nearby construction associated with 4-lane construction

February 26, 2018
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Sendai Construction Office

NEXCO EAST Sendai Construction Office (Wakabayashi Ward, Sendai City) is a 2-lane section (1 lane on each side) E6 Joban Expressway Yamamoto Interchange (IC) -Iwanuma IC is under construction with 4 lanes.

In implementing the four-lane construction, we will drive steel sheet piles near the shoulders near the Expressway.

When driving steel sheet piles, steel sheet piles and driving machines such as cranes will be close to the driving lane. After paying sufficient attention to safety measures, we will install notice signs etc. near the work site. When driving in the vicinity, please exercise caution while looking aside.

Expressway apologize for any inconvenience this may cause, and we ask for your understanding and cooperation.

1 construction section

Joban Expressway Yamamoto IC-Iwanuma IC In-bound line (Tokyo direction)

2 Construction period

March from February 27, 30 years 2019 until around December

3 construction time

From 8:00 to 17:00 or sunset

Image image of construction section

4 Customer contact

  • NEXCO東日本お客さまセンター(24時間オペレーターが対応します。)
    0570-024-024 または 03-5338-7524

Reference material

Image of construction image
Construction image photograph
Image of construction image
Construction image diagram
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.