Yamagata Expressway (between Yudonoyama IC and Shonai Asahi IC) night traffic closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • Yamagata Expressway (between Yudonoyama IC and Shonai Asahi IC) night traffic closure

June 19, 2015
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Tsuruoka Management Office

NEXCO EAST Tsuruoka Management Office (Tsuruoka City, Yamagata Prefecture) will carry out night traffic closures between the Yamagata Expressway Yudonoyama Interchange (IC) and Shonai Asahi IC for pavement repair work and equipment inspections as follows.

In order to minimize the impact on traffic, we will carry out traffic closures at night when traffic volume decreases. In July, Yamagata Expressway, Tohoku-Chuo Expressway and National Route 112 (Gasan Road) will be closed at night. As a result, the use of Yamagata Expressway in the direction of Yamagata ⇔ Sakata cannot be used, so a wide-area detour using Route 13 or Route 47, or Route 7 or Route 113 (Attachment-1 [PDF: 643KB]) Is required, so please cooperate.

We sincerely apologize for any inconvenience this may cause, as this work is necessary to maintain a safe and comfortable environment for Expressway. We appreciate your understanding and cooperation.

1 closed section

Yamagata Expressway Yudonoyama IC-Shonai Asahi IC (upper and lower lines)

2 Closed date and time

3 nights from Tuesday, July 7th to Thursday, July 9th, 2015
(Preliminary days: Monday 13th July to Thursday 16th July, Monday 20th July to Thursday 23rd July)
*Except Saturdays, Sundays, and public holidays, every night from 20:00 to 6:00

Image of closed days

3 detour

Road closure location map and wide area detour map Attachment-1 [PDF: 643KB]

Image of detour

4 Construction content

We will carry out pavement, structure repair, accident recovery and facility cleaning, inspection and repair work for equipment in the tunnel, and jet fan replacement.

5 Information provision

It will be light rain, but it will be postponed if there is a possibility of heavy rain. In addition, the decision to implement the road closure will be made at 17:00 in the evening before the implementation.

[Customer contact]

  • NEXCO東日本お客さまセンター(24時間オペレーターが対応します。)
    0570-024-024
    03-5338-7524(PHS・IP電話のお客さま)
  • ハイウェイテレホン(24時間音声案内)
    山形局 023-685-1620
  • (公財)日本道路交通情報センター
    050-3369-6666(全国共通ダイヤル)
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.