Results of winter tire installation survey (5th)
-Promotion of early winter tire replacement and the fifth report of safe driving on snowy roads-
- Corporate Top
- Press Room
- Press Release Tohoku office
- Results of winter tire installation survey (5th)
December 3, 2014
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office
NEXCO EAST Tohoku Branch (Sendai-shi Aoba-ku), aiming at the early winter tire replacement, will aim to raise a safe driving of snow road driving, in the coming snowfall period, for winter use on expressway We will investigate the mounting condition of the tire and announce the result.
Compared to the previous survey (conducted on November 25th), the winter tire installation rate was higher in the entire Tohoku region, and it was the same level as last year.
However, about 18% of customers still do not have winter tires. In the Tohoku region, snowfall forecasts due to the arrival of cold waves have been released from this week, so please replace the tires for winter early and use a safe drive when using the Expressway.
1 December 1 (Monday) survey results
Survey location | Winter tire installation rate | Number of surveys this time | ||||
---|---|---|---|---|---|---|
This time survey (December 1) | Last survey (November 25) | [Last year's survey] (December 2) | Winter tires Number of installed | Total number | ||
Aomori Prefecture | Tohoku Expressway Aomori IC | 100% | 100% | 100% | 13 | 13 |
Hachinohe Road Hachinohe IC | 90% | 92% | 100% | 19 | 21 | |
Aomori prefecture total | 94% | 95% | 100% | 32 | 34 | |
Akita | Tohoku Expressway Towada IC | 100% | 95% | 100% | 81 | 81 |
Akita Expressway Akita Minami IC | 94% | 91% | 98% | 29 | 31 | |
Akita Michi Yokote IC | 91% | 97% | 97% | 30 | 33 | |
Akita prefecture total | 97% | 95% | 98% | 140 | 145 | |
Iwate Prefecture | Tohoku Expressway Morioka South IC | 95% | 85% | 99% | 103 | 108 |
Tohoku Expressway north Ezuriko IC | 87% | 79% | 92% | 13 | 15 | |
Iwate prefecture total | 94% | 84% | 98% | 116 | 123 | |
Miyagi Prefecture | Tohoku Expressway Furukawa IC | 97% | 93% | 91% | 31 | 32 |
Tohoku Expressway Sendai Miyagi IC | 96% | 84% | 91% | 96 | 100 | |
Miyagi prefecture total | 96% | 86% | 91% | 127 | 132 | |
Yamagata Prefecture | Yamagata Expressway Yamagata Kita IC | 88% | 72% | 92% | 79 | 90 |
Yamagata Road Kushibiki PA | 100% | 94% | 100% | 8 | 8 | |
Yamagata total | 89% | 79% | 95% | 87 | 98 | |
Fukushima Prefecture | Tohoku Expressway Fukushima Iizaka IC | 62% | 78% | 90% | 42 | 68 |
Tohoku Expressway Koriyama IC | 73% | 65% | 76% | 44 | 60 | |
Ban-Etsu Expressway Aizuwakamatsu IC | 79% | 82% | 85% | 79 | 100 | |
Joban Expressway Iwaki Chuo IC | 40% | 49% | 63% | 40 | 101 | |
Fukushima Prefecture total | 62% | 67% | 77% | 205 | 329 | |
Tohoku Regional Head Office | 82% | 80% | 88% | 707 | 861 |
- Survey method: Visually check the tire type of the vehicle passing through the general lane at the tollgate. (100 units or 60 minutes each time)
- "IC" stands for interchange, "PA" stands for parking area.
This document is based on a press release "About the results of winter tire installation status survey (first step)-Promotion of early winter tire replacement and first report on safe driving on snowy roads-(November 6, 2014)" It is a continuous survey of.
2 Request from NEXCO EAST Tohoku Branch
- Please put on early winter tires before snowfall.
Summer tires tend to slip on snowy roads, and slip accidents on winter roads can lead to serious accidents, so please replace them with winter tires early. - "Snowy road operation is safe enough" please. Reference Material-1 [PDF: 139KB]
When driving on snowy roads at the beginning of the season, the feeling of safe driving on the snowy roads has not returned, so even with the winter tires installed, you should keep a sufficient distance between cars and keep your speed down. Please do not operate and drive slowly and safely. - "Frequently gathering information before and after going out" please. Reference Material-2 [PDF: 708KB]
The weather on winter Expressway changes rapidly, so be sure to check the road and weather information before and during your trip.
In order to use the winter highway safely, securely and comfortably, NEXCO EAST enlightenment activities at SA, PA, IC, traffic safety campaign, "Drupa" HP 's winter highway We actively send out information such as lectures ".
* Dr. Mammoshi: A researcher specializing in car and snow road safety
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.