Regarding the closure of the Joban Expressway (Minamisoma IC-Soma IC)

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • Regarding the closure of the Joban Expressway (Minamisoma IC-Soma IC)

August 8, 2014
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Soma Construction Office

NEXCO EAST Tohoku Regional Head Office Soma Construction Office (Soma City, Fukushima Prefecture) is located between Minamisoma IC and Soma IC for new service between Joban Expressway Namie Interchange (IC) and Minamisoma IC and between Soma IC and Yamamoto IC. Will be closed as follows for paving work, sign work, and facility work.

We apologize for the inconvenience and ask for your understanding and cooperation.

1 closed section

Joban Expressway Minamisoma IC-Soma IC (upper and lower lines)

2 suspension period

Daytime on Thursday, August 28, 2014, Friday, August 29, 2014
(Preliminary days: Saturday, August 30, 2014, Sunday, August 31)

3 closed hours

Every day from 7:00 to 19:00

4 detour

National Route 6 Attachment-1 [PDF: 84KB]

5 Construction content

We will perform pavement work, sign work, and facility work for new service between Namie IC and Minamisoma IC and between Soma IC and Yamamoto IC.

6 Information provision

Although it will be light rain, it will be postponed if there is a possibility of heavy rain and strong wind.
In addition, the decision to implement the road closure will be made at 17:00 in the evening of the day before the implementation.

[Customer window]

  • NEXCO東日本お客さまセンター(24時間オペレーターが対応します。)
    0570-024-024
    03-5338-7524(PHS・IP電話のお客様)
  • (公財)日本道路交通情報センター
    050-3369-6666(全国共通ダイヤル)
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.