About result of winter tire wearing situation investigation on Expressway

~ November 30, 2009 ~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • About result of winter tire wearing situation investigation on Expressway

December 2, 2009
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office

NEXCO EAST Tohoku Regional Head Office (Aoba-ku, Sendai, Regional Head Office president: Mikio Kashima), Check the winter tire installation status and ask the customer to replace the tires early. Therefore, Expressway in major interchanges (IC), has implemented the mounting survey of winter tire in the early winter period.

The results of the survey conducted on November 30 are shown in the table below.

The winter tire installation rate is higher than in the previous survey (November 24), but the installation rate is still low in South Tohoku (Miyagi and Fukushima prefectures in particular).

Also, compared with the same period last year, the overall wearing rate is low.

Since it is expected that full-scale snow will fall in the Tohoku region, please change to winter tires early and drive safely.

Survey location Winter tire installation rate 【reference】
Same period last year
(December 1)
This time survey
(November 30)
Last survey
(November 24)
Tohoku Expressway Aomori IC 97% 85% 100%
Tohoku Expressway Towada IC 94% 94% 95%
Hachinohe Road Hachinohe IC 85% 96% 93%
Akita Expressway Akita Minami IC 92% 85% 99%
Akita Michi Yokote IC 100% 85% 100%
Tohoku Expressway Morioka South IC 76% 87% 91%
Tohoku Expressway north Ezuriko IC 95% 98% 100%
Tohoku Expressway Furukawa IC 64% 38% 91%
Tohoku Expressway Sendai Miyagi IC 85% 69% 87%
Yamagata Expressway Yamagata Kita IC 88% 77% 96%
Yamagata Expressway Tsuruoka IC 84% 70% 100%
Tohoku Expressway Fukushima Iizaka IC 51% 34% 75%
Tohoku Expressway Koriyama IC 61% 53% 65%
Ban-Etsu Expressway Aizuwakamatsu IC 88% 73% 93%
Joban Expressway Iwaki Chuo IC 36% 23% 32%
Tohoku 80% 70% 85%

The next survey is scheduled for December 7th.
(It may be changed without notice if the survey could not be performed due to bad weather etc.)

  • Survey method: Visually check the tire type of the vehicle passing through the general lane at the tollgate.

(One time: about 100 units or 30 to 60 minutes)

Reference: Changes in winter tire installation rate (by survey location) [PDF: 22KB]

This material has been updated with the latest data as a supplementary material to the press release “Starting efforts to promote early replacement of winter tires” (November 6, 2009) .

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.