Expressway traffic during the Obon period (Niigata Prefecture) (preliminary report)

From Wednesday, August 8, 2018 to Sunday, August 19, 2018 12 days (2017 comparison period: Wednesday, August 9, 2017 to Sunday, August 20, 2017) 12 days)

  • Corporate Top
  • Press Room
  • Press Release Niigata office
  • Expressway traffic during the Obon period (Niigata Prefecture) (preliminary report)

PDF version [PDF: 245KB]

August 20, 2018
East Nippon Expressway Co., Ltd.
Niigata office

NEXCO EAST Niigata branch (Niigata city Chuo Ward) compiled the traffic situation of the Bon Festival period.

<< Outline of traffic situation >>
  1. The average daily traffic volume of the main sections is year-on-year Almost the same as the previous year (up about 1%) became.
  2. The peak traffic volume during the period is Out-bound line is Saturday, August 11, and the In-bound line is Tuesday, August 14. have become.
  3. The number of traffic jams over 5km 7 times, 1 decrease from the previous year Did.
  4. The biggest traffic jam that occurred during the period was E8Hokuriku Expressway (In-bound line) Nakanoshima Mitsuke IC-Sanjo Tsubame IC "14.5km" due to the traffic concentration that occurred on Tuesday, August 14th was.

1 Major sections during the Bon Festival * 1 Average daily traffic * 2 (Unit / day)

Road name section FY2018
A
FY2017
B
Year-on-year
A / B
E8
Hokuriku Expressway
Makigata East IC-Niigata West IC 55,700 53,000 105%
Joetsu IC-Kakizaki IC 27,900 27,500 101%
Familiar IC-Itoigawa IC 26,100 25,900 101%
E17
Kan-Etsu Expressway
Ojiya IC-Nagaoka IC 31,800 31,900 100%
Mizukami IC to Yuzawa IC 33,800 33,900 100%
E49
Ban-Etsu Expressway
Niitsu Nishi Smart IC-Niigata Central JCT 13,400 13,600 99%
Tsugawa IC-Mikawa IC 12,600 13,000 97%
E18
Joshin-Etsu Expressway
Joetsutakada IC-Joetsu JCT 21,400 21,700 99%
Shinano-machi IC - Myoko Kougen IC 24,700 24,500 101%
E7
Tohoku Expressway
Nakajo IC-Arakawa Wombai IC 14,200 14,900 95%
Daily traffic volume based on simple average of the above 10 sections 26,200 26,000 101%
"IC: Interchange", "JCT: Junction"
  • 1: Interchange section near the prefectural border and near major cities
  • 2: Traffic volume is approximate by traffic counter (all models)
"reference" FY2018 And the array of days for the Bon Festival in FY2017
H30 year 8/8
(WED)
8/9
(THU)
8/10
(FRI)
8/11
(SAT)
8/12
(SUN)
8/13
(MON)
8/14
(TUE)
8/15
(WED)
8/16
(THU)
8/17
(FRI)
8/18
(SAT)
8/19
(SUN)
H29 year 8/9
(WED)
8/10
(THU)
8/11
(FRI)
8/12
(SAT)
8/13
(SUN)
8/14
(MON)
8/15
(TUE)
8/16
(WED)
8/17
(THU)
8/18
(FRI)
8/19
(SAT)
8/20
(SUN)

2 Main traffic congestion points

FY2018 Occurrence of traffic jam during the Obon period (maximum traffic length of 5 km or more): 7 times in total
worst Road name / direction Date and time of traffic jam Traffic jam location Congestion length Congestion factors
1 E8 Hokuriku Expressway (above) Tuesday, August 14 11:30 Nakanoshima Mitsuke-Sanjo Tsubame 14.5km Traffic concentration
2 E18 Joshin-Etsu Expressway (below) Sunday, August 12 12:00 Joetsutakada-Myoko Kogen 9.0km Traffic concentration
3 E18 Joshin-Etsu Expressway (below) Saturday, August 11 8:15 Myoko Kogen ~ Toyota Iiyama 7.0km Traffic concentration
4 E18 Joshin-Etsu Expressway (above) Tuesday, August 14 17:15 Myoko Kogen-Nakago 6.5km Traffic concentration
5 E18 Joshin-Etsu Expressway (below) Sunday, August 12 9:45 Myoko Kogen ~ Toyota Iiyama 6.5km Traffic concentration
6 E18 Joshin-Etsu Expressway (below) Saturday, August 11th 10:30 Joetsutakada-Nakago 6.1km Traffic concentration
7 E18 Joshin-Etsu Expressway (above) Wednesday, August 15 17:15 Myoko Kogen-Nakago 5.0km Traffic concentration
"reference"
FY2017 Traffic congestion during the Obon period (maximum traffic length of 5 km or more): 8 times in total
worst Road name / direction Date and time of traffic jam Traffic jam location Congestion length Congestion factors
1 E18 Joshin-Etsu Expressway (below) Saturday, August 12 12:00 Joetsutakada-Myoko Kogen 11.5km Traffic concentration
2 E8Hokuriku Expressway (below) Saturday, August 12 11:15 Sanjo Tsubame-Nakanoshima Mitsuke 9.0km accident
3 E18 Joshin-Etsu Expressway (below) Friday, August 11 11:45 Joetsutakada-Nakago 7.0km Traffic concentration
4 E18 Joshin-Etsu Expressway (below) Sunday, August 13 12:15 Joetsutakada-Nakago 6.5km Traffic concentration
5 E7 Nitto Expressway (below) Monday, August 14 11:45 Nakajo-Seigo Shibata 6.5km accident
6 E17Kan-Etsu Expressway (below) Friday, August 11 10:00 Shiozawa Ishiuchi-Water 6.1km accident
7 E18 Joshin-Etsu Expressway (above) Sunday, August 13 18:45 Nakago-Joetsutakada 5.0km Traffic concentration
8 E18 Joshin-Etsu Expressway (above) Monday, August 14 16:30 Nakago-Joetsu JCT 5.0km Traffic concentration