[E16] Notice of nighttime ramp closure at Kamariya JCT Yokohama Yokosuka Road
~ We will repair damaged pavement ~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [E16] Notice of nighttime ramp closure at Kamariya JCT Yokohama Yokosuka Road
The latest regulatory information isDraTraPlease see.
August 26 2024
East Nippon Expressway Co., Ltd.
Keihin Management Office
NEXCO EAST Keihin Management Office (Yokohama, Kanagawa Prefecture) will be implementing night-time closures to carry out pavement repair work at the ramps at Kamariya Junction (hereinafter referred to as "JCT") where the E16 Yokohama Yokosuka Road (hereinafter referred to as "Yokoyoko")'s In-bound lanes merge into the Yokoyokodo Kanazawa Branch (hereinafter referred to as "Kanazawa Branch"), and where the Kanazawa Branch merges into the Yokoyokodo's In-bound lanes.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.
1. 1. Ramp closure location and date and time
number | Road name | Closed point | period | Attachment |
---|---|---|---|---|
① | E16 Yokomichi | [Kamariya JCT] From Yokoyokomichi In-bound Line to Kanazawa Branch Line (Towards the Shuto Expressway Wangan Line) |
Monday, September 9 9pm to 5am the next morning |
Document 1 [PDF: 241KB] |
② | [Kamariya JCT] From Kanazawa Branch Line In-bound Line (Tokyo bound) entrance ramp |
September 17th (Tuesday) - 19th (Thursday) Every night from 10pm to 5am the next morning |
Document 2 [PDF: 265KB] |
- Attached to each line E16 The indication such as shows the route number (numbering) of Expressway.
- In stormy weather, it will be postponed to the spare day.
- Decisions on construction implementation will be made on X (formerly Twitter) etc. around 5:00 pm on the day of construction.
2. Construction overview
Due to damage to the pavement at the Kamariya JCT ramp flowing from the Yokoyokodo In-bound Line to the Kanazawa Branch Line (toward the Metropolitan High Bay Line) and from the Kanazawa Branch Line to the Yokoyokodo In-bound Line (toward Tokyo), pavement repair work will be carried out.
The section where this work is to be carried out is one lane, and since it is not possible to carry out construction under normal lane regulations, it is necessary to close the ramp and carry out the work. Therefore, in order to minimize inconvenience to our customers, we will close the ramps on weekday evenings when traffic is low, and carry out construction intensively and efficiently. This is necessary for the safe and comfortable use of Expressway, so we ask for your understanding and cooperation.
3. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
- A banner will be posted on the overpass on the Expressway.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
または:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time information[Mobile] http://m.drivetraffic.jp/Construction regulation information
- 日本道路交通情報センター(JARTIC)道路交通情報
全国共通ダイヤル 050-3369-6666
(携帯電話短縮ダイヤル #8011)
- Connect to the nearest information center from anywhere in Japan.
神奈川情報 050-3369-6614
【PC】https://www.jartic.or.jp/
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed on official X (formerly Twitter) and LINE accounts.
- [X (formerly Twitter)]
"NEXCO EAST (Kanto)" ( @e_nexco_kanto )Real-time traffic information"NEXCO EAST (Kanto construction regulations)" ( @e_nexco_kanto_k )Judgment of implementation of construction regulations - [LINE]
"NEXCO EAST" (@e-nexco)Weather information and road closures
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.