[C3] Notice of closure of night ramp on Gaikan Expressway

~ We will repair damaged pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C3] Notice of closure of night ramp on Gaikan Expressway

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 655KB]

August 20 2024
East Nippon Expressway Co., Ltd.
Misato Management Office

NEXCO EAST Misato Management Office (Misato Prefecture) will be closing the ramps at the interchange (hereinafter referred to as "IC") on the C3 Gaikan Expressway (hereinafter referred to as "Outer Ring Expressway") to carry out pavement repair work.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. 1. Ramp closure location and date and time

number Road name Closed point period Attachment
C3 Outer ring road 外環三郷西IC
(外回り 出口ランプ)
9月3日(火)
夜21時~翌朝5時
Document 1 [PDF: 276KB]
三郷南IC
(内回り 入口ランプ)
9月9日(月)
夜20時~翌朝5時
資料2【PDF:261KB】
Kawaguchi East IC
(Outer entrance ramp)
9月10日(火)~11日(水)
夜20時~翌朝5時
資料3【PDF:262KB】
  • 各路線に付しているC3の表示は、高速道路等の路線番号(ナンバリング)を示しています。
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • 荒天時は、予備日に順延します。
    順延する場合の予備日や迂回路等については、別添資料【PDF:445KB】をご覧ください。
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Construction overview

Due to damage to the road surface at each interchange on the Outer Ring Road, pavement repair work will be carried out.
Since construction work cannot be carried out under normal lane restrictions, it is necessary to close the ramps to carry out the work. Therefore, in order to minimize inconvenience to customers, we will close the ramps at night on weekdays when traffic volume is low, and carry out the work in a concentrated and efficient manner. This work is necessary to ensure that customers can use Expressway safely and comfortably, so we ask for your understanding and cooperation.

Pavement repair work work status photo Image of caption of work status for pavement repair work
Road surface damage photo Caption image of the road damage situation

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Judgment on implementation of construction regulations
    [LINE]
    “NEXCO EAST” (@e-nexco) Weather information and road closures
Adobe Acrobat Readerのダウンロードページへの画像リンク(外部リンク)

PDFファイルをご覧いただくには、AdobeSystems社のプラグインソフト「Acrobat Reader(日本語版)」が必要です。お持ちでない方は、こちらからダウンロード(無料)してご利用ください。