[E16] Yokohama Yokosuka Road Out-bound Line Konandai IC Exit Ramp
Notice of night closure

April 15th (Monday) to 16th (Tuesday) from 10pm to 5am each day
~We will carry out sound insulation wall repair work, pavement repair work, and bridge expansion/contraction device replacement work~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E16] Yokohama Yokosuka Road Out-bound Line Konandai IC Exit Ramp Notice of Night Closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 334KB]

April 1, 2024
East Nippon Expressway Co., Ltd.
Keihin Management Office

At NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture), we carry out sound insulation wall repair work, pavement repair work, etc. on Out-bound line of the E16 Yokohama Yokosuka Road (hereinafter referred to as ``Yokoyokodichi'') and the Out-bound line of the Konandai Interchange (hereinafter referred to as ``IC'') exit ramp. The bridge will be closed overnight due to replacement work on the bridge expansion device.
We apologize for any inconvenience this may cause to our customers, but we ask for your understanding and cooperation so that you have plenty of time to spare when you go out.

1. 1. Closing location and date and time

  1. Closed location:
    Yokoyokomichi Out-bound Line Konandai IC Exit Ramp
  2. Image of closed area
    • Attached to each line E16 The indication such as shows the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    April 15th (Monday) to April 16th (Tuesday) 2024
    Every day from 22:00 to 5:00 the next morning
    Preparation day:
    2024 April 17th to Thursday, April 18th, 2020
    Every day from 22:00 to 5:00 the next morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Detour

To detour, please use the Hino IC exit as shown in the diagram below.
If you take a detour using Prefectural Route 21, Maioka-Kamigo Line, and Loop Route 3 as indicated by  the blue arrow, it will take approximately 8 minutes instead of the usual 2 minutes.

Image of detour
Image of [Legend]

3. Construction overview

Yokoyokomichi Out-bound Line At the Konandai IC exit ramp, damage has occurred to the sound insulation wall, pavement, and bridge, so repair work for the sound insulation wall, pavement repair work, and replacement of the expansion device installed at the joint between the bridge roofs will be carried out. Masu.
The section where this work will be carried out has one lane, and since it is not possible to carry out the work under normal lane regulations, it is necessary to close the ramp. To minimize inconvenience to customers, ramps will be closed on weekday nights when traffic is light, and construction will be carried out intensively and efficiently.
This work is necessary to ensure safe and comfortable use Expressway, so we ask for your understanding and cooperation.

Sound insulation wall repair work Photos of work status Sound insulation wall repair work Image of work status caption
Pavement repair work work status photo Image of caption of work status for pavement repair work
Telescopic device replacement work Photograph of work situation Extension device replacement work Caption image of work status

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.