[E16] Yokohama Yokosuka Road In-bound Line Kamariya JCT Night Lamp Closure Notice

~ We will repair damaged pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E16] Yokohama Yokosuka Road In-bound Line Kamariya JCT Night Lamp Closure Notice

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 687KB]

January 22, 2024
East Nippon Expressway Co., Ltd.
Keihin Management Office

NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture) is carrying out pavement repairs on the E16 Yokohama Yokosuka Road (hereinafter referred to as ``Yoko-Yokomichi'') In-bound line Kamariya Junction (hereinafter referred to as ``JCT'') on the ramp that flows into the Kanazawa branch line. Due to construction work, we will be closed overnight.
We apologize for any inconvenience this may cause to our customers, but we ask for your understanding and cooperation so that you have plenty of time to spare when you go out.

1. 1. Closing location and date and time

  1. Closed location:
    Yokoyokomichi In-bound Line Kamaridani JCT Inflow ramp to Kanazawa Branch Line
  2. Image of closed area
    • Attached to each line E16 The indication such as shows the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    2024
    Every day from 21:00 to 5am the next morning
    Preparation day:
    2024 15th (Thursday) - 16th (Friday), 19th (Monday) - 21st (Wednesday), 2020
    Every day from 21:00 to 5am the next morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • Decisions on construction implementation will be made on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Detour

Refer to the figure below for detours.
Detours will increase the time required, so please take time to go out.

 If you take a detour from Asahina IC via Prefectural Route 23 and National Route 16 as indicated by the blue arrow, it is expected to take approximately 21 minutes (normally approximately 8 minutes).

Image of detour
Image of [Legend]

3. Construction overview

Yokoyokomichi In-bound Line Pavement repair work will be carried out due to damage to the pavement at the ramp leading from Kamaridani JCT to the Kanazawa branch line.
The section where this work will be carried out has one lane, and since it is not possible to carry out the work under normal lane regulations, it is necessary to close the ramp and carry out the work. Therefore, in order to minimize the inconvenience to customers, the ramp will be closed on weekday nights when traffic is light, and construction will be carried out intensively and efficiently. This work is necessary to ensure safe and comfortable use Expressway, so we ask for your understanding and cooperation.

Photo of pavement damage situation Image of caption of pavement damage situation
Pavement repair work work status photo Image of caption of work status for pavement repair work

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.