[E14] Keiyo Road Out-bound Line Funabashi IC Exit Ramp Notice of Night Closure
From October 30th (Monday) to November 1st (Wednesday) from 9:00 PM to 5:00 AM the next morning
~We will repair the damaged pavement~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [E14] Keiyo Road Out-bound Line Funabashi IC Exit Ramp Notice of Night Closure
The latest regulatory information isDraTraPlease see.
October 16, 2020
East Nippon Expressway Co., Ltd.
Chiba Management Office
NEXCO EAST Chiba Management Office (Chiba City, Chiba Prefecture) will be closed overnight to perform pavement repair work at the exit ramp of the Funabashi Interchange (hereinafter referred to as "IC") on the E14 Keiyo Road Out-bound line.
We apologize for any inconvenience this may cause to our customers, but we ask for your understanding and cooperation so that you have plenty of time to spare when you go out.
1. 1. Closing location and date and time
- Closed location:
Keiyo Road Out-bound line (from Tokyo) Funabashi IC exit ramp - Attached to each line E14 The indications such as indicate the route number (numbering) of Expressway.
- Date and timeImplementation date:October 30th (Monday) to November 1st (Wednesday), 2020Every day from 21:00 to 5am the next morningPreparation day:November 6th (Monday) to November 8th (Wednesday), 2020Every day from 21:00 to 5am the next morning
- In stormy weather, it will be postponed to the spare day.
- The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.
2. Detour
Please refer to the diagram below for detours.
If you take a detour between Keiyo Road Baraki IC and Funabashi IC via Prefectural Route 180 and National Route 14, it is expected to take approximately 8 minutes (normally approximately 2 minutes).
The detour will increase the travel time, so please allow plenty of time for your trip.
3. Construction overview
Due to damage to the road surface at the Funabashi IC exit ramp on Keiyo Road Out-bound Line, pavement repair work will be carried out. The section where this work will be carried out has one lane, and since the work cannot be carried out under normal lane regulations, it is necessary to close the ramp.
Therefore, in order to minimize the inconvenience to customers, the ramp will be closed on weekday nights when traffic is light, and construction will be carried out intensively and efficiently. This work is necessary to ensure safe and comfortable use Expressway, so we ask for your understanding and cooperation.
Four. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
- A banner will be posted on the overpass on the Expressway.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
または:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time information[Mobile] http://m.drivetraffic.jp/Construction regulation information
- 日本道路交通情報センター(JARTIC) 道路交通情報
全国共通ダイヤル 050-3369-6666
(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
全国・関東甲信越情報 050-3369-6600
千葉情報 050-3369-6612
【PC】https://www.jartic.or.jp/
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - iPhone / Android application "E-High Radi"
It delivers real-time emergency information such as accidents and falling objects that occurred most recently in the direction of travel.
https://www.driveplaza.com/traffic/e-highwayradio/ - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed on official X (formerly Twitter) and LINE accounts.
[X (old Twitter)]
"NEXCO EAST (Kanto)"
(@e_nexco_kanto) Real-time traffic information
"NEXCO EAST (Kanto construction regulations)"
(@e_nexco_kanto_k) Decision to implement construction regulations
[LINE]
"NEXCO EAST" (@e-nexco) Road closures and weather information
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.