[E83] Yokohama-Shindo Road Out-bound Line Hoshikawa IC entrance lamp Notice of closing at night

July 25th (Tue) and 26th (Wed) from midnight to 5:00 am
-Pavement repair work and countermeasure work for reverse driving-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Yokohama-Shindo Road Out-bound Line Hoshikawa IC entrance lamp Notice of closing at night

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 483KB]

July 7, 5th year of Reiwa
East Nippon Expressway Co., Ltd.
Keihin Management Office

At NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture), the entrance ramp of the Hoshikawa Interchange (hereinafter referred to as "IC") on the E83 Yokohama-Shindo Road Out-bound Line will be closed at night to carry out pavement repair work and reverse run countermeasure work. .
We apologize for the inconvenience, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. 1. Closing location and date and time

  1. Closure location:
    Yokohama-Shindo Road Out-bound Line Hoshikawa IC entrance ramp
  2. Image of closed area
    • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    July 25 (Tue) and 26 (Wed), 2023
    00:00 to 05:00 each day
    Preparation day:
    Thursday, July 27th and Friday, July 28th, 2023
    00:00 to 05:00 each day
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In case of rain, it will be postponed to the spare day.
  • We will inform you about the construction implementation decision on Twitter around 17:00 the day before.

2. Detour

When detouring, please use the Hodogaya Bypass Shin-Sakuragaoka IC entrance as shown below.
As indicated by the  blue arrow, it will take about 21 minutes (usually about 7 minutes) if you detour via Hotokecho Route 102, Kawashima Iwama Route, and Kanjo Route 2.

  • Please note that if you use the Fujitsuka IC, you cannot go to Totsuka.
Image of detour
Image of [Legend]

3. Construction overview

At the entrance ramp of Hoshikawa IC on the Yokohama-Shindo Road Out-bound Line, pavement repair work will be carried out due to damage to the road surface, and countermeasure work (road markings, color pavement) will be carried out to prevent reverse driving Expressway.
The section where this work will be carried out is a single lane, and since construction cannot be carried out under normal lane restrictions, it is necessary to work with the ramp closed. In order to minimize inconvenience to customers, the ramp will be closed at night on weekdays when traffic is light, and construction will be carried out intensively and efficiently.
We ask for your understanding and cooperation as this work is necessary for safe and comfortable use of Expressway.

Pavement repair work work status photo
Image of caption of work status for pavement repair work
Reverse run countermeasure construction work status photo
Reverse driving countermeasure work image of the caption of the work situation

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official accounts of Twitter and LINE.
    [Twitter]
    "NEXCO EAST (Kanto)"
    (@e_nexco_kanto) real-time traffic information
    "NEXCO EAST (Kanto Construction Regulations)"
    (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.