[E51] Higashi-Kanto Expressway between Narita JCT and Daiei IC (upper and lower lines)
[C4] Ken-o Expressway between Shimousa IC and Daiei JCT (inner and outer loop)
Notice of road closure at night

June 26th (Monday), July 18th (Tuesday) From 21:00 to 5:00 the next morning
~We will remove the existing overpass and build a new bridge~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E51] Between Narita JCT and Daiei IC on Higashi-Kanto Expressway (up and down lines) [C4] Between Shimousa IC and Daiei JCT on Ken-o Expressway (inner and outer loops) Notice of nighttime traffic closure

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 948KB】

May 19, 2020
East Nippon Expressway Co., Ltd.
Chiba Management Office

At NEXCO EAST Chiba Management Office (Chiba City, Chiba Prefecture) and Chiba Construction Office (Chiba City, Chiba Prefecture), E51 Higashi-Kanto Expressway (hereinafter "Higashi Kanto Expressway") up and down line Narita Junction (hereinafter "JCT") to Daiei (Taiei) Interchange (hereinafter referred to as "IC") and C4 Ken-o Expressway (hereinafter referred to as "Ken Ken-O Road") From Shimofusa IC to Daiei JCT, removal of existing overpass and construction of Daiei JCT bridge The road will be closed at night to carry out collective erection work.
We apologize for the inconvenience, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. Closed section and date and time

  1. Closed section:

    [1] Higashi Kanto Expressway Up and Down Line Narita JCT - Daiei IC (including Daiei PA)
    [2] Ken-O Road Shimousa IC - Daiei JCT

  2. Image image of closed section
    • The New Airport Expressway (hereafter referred to as the "New Airport Expressway") is accessible from the Higashi-Kanto Expressway (towards Tokyo) and from the Higashi-Kanto Expressway (towards Tokyo) to the New Airport Expressway.
  3. Date and time
    Implementation date:
    June 26 (Mon), July 18 (Tue), 2023
    Every day from 21:00 to 5am the next morning
    Preparation day:
    June 27 (Tue), July 19 (Wed) - 21 (Fri), 2023
    Every day from 21:00 to 5am the next morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • The parking areas in the closed section will be closed as follows.
    Higashi Kanto Expressway In-bound-bound Daiei PA 21:00 - 5:00 the next morning
  • In stormy weather, it will be postponed to the spare day.
  • The construction implementation decision will be made on Twitter etc. around 17:00 on the evening of the day.

2. Detour

Please refer to Attachment-1 [PDF: 1.0MB] for detour routes.
The detour will increase the travel time, so please leave with plenty of time.

3. Regarding transit adjustments due to suspension of traffic

For customers who temporarily flow out of Expressway due to road closures, detour around the road closure section, re-enter and transfer in the forward direction, we will implement "connection adjustment" to adjust the toll according to the section used. increase. (Refer to Attachment-2 [PDF: 271KB])

Transfer designated IC

Closed place Outflow designation IC Re-inflow designated IC
① [East Kanto Expressway] (Out-bound line) Narita JCT ⇒
[Higashi Kanto Expressway] (Out-bound line) Daiei IC,
[Ken-O Road] (Inner loop) Shimousa IC
[East Kanto Expressway] (Out-bound)
Tomisato IC, Narita IC
[East Kanto Expressway] (Out-bound)
Daiei IC, Sawara Katori IC
[Ken-O Road] (Inner loop)
Shimousa IC, Kanzaki IC, Inashiki Higashi IC
② [Higashi Kanto Expressway] (In-bound line) Daiei IC ⇒
[East Kanto Expressway] (In-bound line) Narita JCT,
[Ken-O Road] (Inner loop) Shimousa IC
[East Kanto Expressway] (In-bound line)
Sawara Katori IC, Daiei IC
[East Kanto Expressway] (In-bound line)
Narita IC, Tomisato IC, Shisui IC
[Ken-O Road] (Inner loop)
Shimousa IC, Kanzaki IC, Inashiki Higashi IC
③ [Ken-O Road] (Outer) Shimousa IC ⇒
[Higashi Kanto Expressway] (Out-bound line) Daiei IC
[Ken-O Road] (Outer)
Kanzaki IC, Shimousa IC
[East Kanto Expressway] (Out-bound)
Daiei IC, Sawara Katori IC
④ [Ken-O Road] (Outer) Shimousa IC ⇒
[East Kanto Expressway] (In-bound line) Narita JCT
[East Kanto Expressway] (In-bound line)
Narita IC, Tomisato IC, Shisui IC

How to use transit adjustment

ETC customers

  • Customers using ETC are requested to run the outflow designated IC wirelessly and the re-inflow designated IC wirelessly. (No transit certificate will be issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers with cash, etc.

  • Customers who pay by cash, etc. should receive the "passage certificate" at the outflow designated IC, and then get the "passport" at the re-inflow designated IC, and then make the "transfer" at the toll booth that pays the fare first. Please give us your "certificate" and "passport".

Common to ETC and cash customers

  • If the road closure is lifted after flowing out from the outflow designated IC, the toll will be adjusted even if it is reinflowed from the IC (including the outflow designated IC) in the closed section in the forward direction.

Four. Construction overview

  1. Due to the extension of runway B at Narita Airport, it is necessary to create an overpass between the existing Higashi Kanto Expressway and the B runway extension. We are planning to carry out construction work.
    This time, we will carry out construction to remove the existing 2 overpass bridges that will be a hindrance in order to temporarily detour the Higashi Kanto Expressway. Since the work to remove the overpass is carried out on the main line of Higashi Kanto Expressway using a multi-axle truck, it is necessary to implement a road closure. In order to minimize inconvenience to customers, the road will be closed at night on weekdays when there is little traffic. We ask for your understanding and cooperation.
    [State of bridge removal work]
    Photo of [Bridge removal work]
  2. Along with Ken-O Road (between Daiei JCT and Matsuo-Yokoshiba IC) construction projects, we will carry out the bridge construction work for the main line bridge and ramp bridge that intersect with the Higashi-Kanto Expressway. Since the collective erection work will be done on the main line of Higashi Kanto Expressway using a multi-axle truck, it is necessary to implement a road closure. In order to minimize inconvenience to customers, the road will be closed at night on weekdays when there is little traffic. We ask for your understanding and cooperation.
    [State of bridge construction work]
    Image of [state of bridge construction work]
    [Collective installation part (red part)]
    Image image of [Collective erection part (red part)]

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official accounts of Twitter and LINE.
    [Twitter]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) real-time traffic information
    "NEXCO EAST (Kanto Construction Regulations)" (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.