[E19] Nagano Expressway Out-bound Line Between Azumino IC and Koshoku IC
Notice of nighttime traffic closure due to tunnel renewal construction
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [E19] Notice of nighttime traffic closure due to tunnel renewal work between Azumino IC and Koshoku IC on Nagano Expressway Out-bound Line
The latest regulatory information isDraTraPlease see.
May 10, 2020
East Nippon Expressway Co., Ltd.
Nagano construction office
NEXCO EAST At the Nagano Construction Office (Nagano City, Nagano Prefecture), E19 Nagano Expressway (hereinafter referred to as "Nagano Road") Azumino Interchange (hereinafter referred to as "IC") On the Out-bound line between the Koshoku IC and the Koshoku IC, the road will be closed at night due to the renewal work of the aging Ipponmatsu Tunnel.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation in the construction.
1. 1. Overview of lane regulations
Route | E19 Nagano Road |
---|---|
section | Out-bound line Azumino IC ⇒ Koshoku IC |
Implementation period | [Implementation date] Wednesday, June 7, 2023, Tuesday, June 20 【Preparation day】 June 8 (Thursday), June 12 (Monday), June 21 (Wednesday), June 22 (Thursday), 2023 |
Time zone | 21:00 pm-6: 00 am the next morning |
Construction content | Tunnel Reinforcement Work (See “4. Construction Overview”) |
Construction image photograph
2. Construction section
Nagano Expressway Out-bound Line Azumino IC ⇒ Koshoku IC
- Please check Attachment-1 [PDF: 148KB] for detours due to road closures.
3. Regarding transit adjustments due to suspension of traffic
For customers who temporarily flow out of Expressway due to road closures, detour around the road closure section, re-enter and transfer in the forward direction, we will implement "connection adjustment" to adjust the toll according to the section used. increase.
(Refer to Attachment-2 [PDF: 137KB])
Transfer designated IC
Closed place | Outflow designation IC | Re-inflow designated IC |
---|---|---|
[Nagano Expressway] (Out-bound line) Azumino IC → Koshoku IC |
[Nagano Expressway] (Out-bound) Azumino IC Azusagawa Smart IC (*) Matsumoto Interchange |
[Nagano Expressway] (Out-bound line) Koshoku IC [Joshinetsu Expressway] (Out-bound line) Nagano IC, Suzaka Nagano East IC [Joshinetsu Expressway] (In-bound line) Sakaki IC, Ueda Sugadaira IC |
- Azusagawa Smart IC is limited to ETC vehicles of all models (12m or less).
How to use transit adjustment
<< ETC customers >>
- Customers using ETC are requested to run the outflow designated IC wirelessly and the re-inflow designated IC wirelessly. (No transit certificate will be issued for ETC vehicles)
- ETC time zone discount will be applied, considering the transited journey as one.
Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate. - Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.
<< Customers for cash, etc. >>
- Customers who pay by cash, etc. should receive the "passage certificate" at the outflow designated IC, and then get the "passport" at the re-inflow designated IC, and then make the "transfer" at the toll booth that pays the fare first. Please give us your "certificate" and "passport".
《Common to customers such as ETC and cash》
- If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.
Four. Construction overview
At the Ipponmatsu Tunnel located between Asagi IC and Koshoku IC on the Nagano Out-bound Line, tunnel reinforcement work will be carried out to prevent road surface swelling and damage due to expansion of the tunnel ground.
During the nighttime closure on June 7 (Wednesday), work will be carried out to switch the central drainage pipe in the tunnel, and during the nighttime closure on June 20 (Tuesday), the lane where customers will be driving will be separated from the lane where the construction work will be carried out. We will install a protective fence for the purpose. Since these construction works cannot be carried out under normal lane restrictions, the construction work will be carried out after closing the road at night on weekdays when there is little traffic.
[Details of main construction]
In order to create a stronger ring-shaped structure for the tunnel where excessive force is applied from around the tunnel, an invert is installed to improve stability. Specifically, concrete (invert) will be installed to reinforce the bottom of the tunnel after the excavation of the road surface, and then paving work will be carried out to restore the road to a drivable one.
In order to minimize the inconvenience to customers, we will close the road at night on weekdays when the traffic volume is low, and carry out the construction work intensively and efficiently. We ask for your understanding and cooperation as this work is necessary for safe and comfortable use of Expressway.
Five. How to obtain traffic information
(1) Road traffic information available before going out
- Dedicated website for Expressway renewal project
https://www.e-nexco.co.jp/renewal/ - NEXCO EAST website "Construction regulation information"
(providing information on construction regulations in each region)
Please select "Construction regulation information" from the "Expressway users" tag.
https://www.drivetraffic.jp/construction-regulation - NEXCO EAST road traffic information site "DraTra "
(Provides traffic information on Expressway nationwide)
[PC] https://www.drivetraffic.jp/
[Mobile] http://m.drivetraffic.jp/ - NEXCO東日本お客さまセンター
(24時間、365日、お客さまの声をお聞きしています)
ナビダイヤル 0570-024-024(24時間オペレーターが対応)
または 03-5308-2424 - 日本道路交通情報センター(JARTIC)の道路交通情報
全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
全国・関東甲信越情報 050-3369-6600
長野情報 050-3369-6620
【PC】 https://www.jartic.or.jp/
(2) Road traffic information that can be obtained while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.
- Traffic information is also distributed on Twitter's official account "NEXCO EAST (Kanto)" (@e_nexco_kanto).
(3) Information on distribution/postings
- Information on posters, leaflets and digital signage will be posted at nearby tollhouses, SA / PA.
- A banner will be posted on the overpass on the Expressway.
Expressway renewal project
Now, safety and security are passed on to the next generation.
NEXCO EAST will work on the renewal and repair business of Expressway in order to deliver safety and security to everyone.
Or search for "high-speed renewal".
The NEXCO EAST Group has positioned the period from 2021 to 2025 as "a period that contributes to the achievement of the SDGs and transforms into a new future society," and is making various efforts.
We believe that this "renewal work" initiative will contribute to the SDGs goals No. 8, 9, and 11 as business activities that lead to the development of safe, secure, and reliable infrastructure.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.