[E83] Yokohama-Shindo Road Notice of new Hodogaya IC night closure

From Monday, July 6th to Thursday, August 27th, Monday-Thursday, from 20pm each day to 5am the next morning
~Bridge repair work~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Yokohama-Shindo Road Notice of new Hodogaya IC night closure

The latest regulatory information isDraTraPlease see.

July 28, 2020
East Nippon Expressway Co., Ltd.
Keihin Administration Office

NEXCO EAST At Keihin Management Office (Yokohama, Kanagawa), E83 From Yokohama-Shindo Road (Out-bound line), at the new Hodogaya Interchange (“IC”) ramp that flows into the direction of Hodogaya Bypass Hachioji on Route 16, the night ramp will be closed for bridge repair work. I will carry it out.
We apologize for the inconvenience, but we ask for your understanding and cooperation so that you may have some time when you go out.
 * Since the construction of this site has been postponed significantly due to the stormy weather, we will inform you of the schedule again.

1. Closed place and date and time

(1) Closed place
Ramp that flows from Yokohama-Shindo Road (Out-bound line) to Route 16 Hodogaya bypass Hachioji

Image of closed area
  • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.

(2) Date and time * Due to postponement due to rain, etc., the implementation date and spare day have been changed.
[After change]

Implementation date:
July 6 (Mon) 2020 21 (Tue)
Every evening from 20:00 to 5:00 the next morning (excluding Fridays, Saturdays, Sundays, and holidays)
2020 From Monday, July 27th Thursday, August 6
Every evening from 20:00 to 5:00 the next morning (excluding Fridays, Saturdays, Sundays, and holidays)
2020 August 18 (Tuesday) to August 27 (Thursday)
Every evening from 20:00 to 5:00 the next morning (excluding Fridays, Saturdays, Sundays, and holidays)
Preparation day:
2020 Monday, August 31-Thursday, September 10
Every evening from 20:00 to 5:00 the next morning (excluding Fridays, Saturdays, Sundays, and holidays)

Image of closing date

Image of QR code
  • In stormy weather, it will be postponed to the spare day.
  • Construction will be decided on Twitter etc. around 17:00 on the day.

2. Detour

In detour, Attachment-1 [PDF: 909KB] Please refer to.
Detours will increase the time required, so please allow plenty of time before going out.

3. Pre-regulation due to lamp closure

Due to the construction work, the lanes and shoulders on the right side of the ramp will be restricted from 6pm each day.
Detail is Attachment-2 [PDF: 486KB] Please refer to.

4. Construction overview

At Yokohama-Shindo Road 's new Hodogaya IC lamp, repair work will be carried out because the bridge floor slab is damaged. When carrying out the construction, it is necessary to close the lamps of the Shin-Hodogaya IC because the construction cannot be done with normal lane regulations. Therefore, in order not to inconvenience our customers as much as possible, we will close the lamps on weekdays during the night when traffic is light and carry out construction work intensively and efficiently.
The construction is necessary to use Expressway safely and comfortably. We appreciate your understanding and cooperation.

Floor slab damage picture
Floor slab repair work work status photo

5. How to get traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway information terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA/PA.
  • VICS
    Road traffic information can be obtained from VICS-compatible car navigation and other on-board devices.
  • * Twitter's official account "NEXCO EAST (Kanto)" (@e_nexco_kanto ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.