[E18] Joshin-Etsu Expressway Usui Karuizawa IC-Saku IC (Out-bound line)
Notice of day-night continuous lane regulation (2nd report)

Until April, 2019, excluding traffic congestion period
One-lane regulation will be implemented day and night, and tunnel repair work will be carried out.

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E18] Joshin-Joshin-Etsu Expressway Usui Karuizawa IC-Saku IC (Out-bound Line) Notice of day-night continuous lane regulation (2nd report)

August 17, 2017
East Nippon Expressway Co., Ltd.
Saku Management Office

Image of Renewal

NEXCO EAST Saku Management Office (Saku City, Nagano Prefecture), E18 Joshin-Etsu Expressway (hereinafter referred to as "Joshinetsu Road") Usui Karuizawa Interchange (hereinafter referred to as "IC") - Saku between the IC Out-bound in line, we are implementing a tunnel repair work from April 2017. Thank you for your understanding and cooperation for the construction work. Due to the summer traffic congestion period, the lane regulation due to construction was temporarily lifted, but construction will resume from August 21, 2017 (Monday).

This time, as the second report, we will inform you of the regulation schedule until mid-December 2017. Also, during the construction period, Homepage for construction We have prepared, so please refer to it when using the Expressway.

This work is necessary to keep the Expressway network function healthy for a long period of time, so we ask for your understanding and cooperation.

1 Construction section Joshinetsu Expressway Usui Karuizawa IC-Saku IC (Out-bound line)

(1) Restricted section

Image of restricted section

2 Regulation period

Target period: Monday, August 21, 2017 to mid-December 2017 (day-night continuous lane regulation)

However, lane restrictions will not be enforced during the three consecutive holidays during the autumn holiday season, which is a busy season. Before and after the traffic congestion period and on Saturdays and Sundays, it is expected that the traffic will be heavier than usual and the traffic will be poor, so please take time to go out.

[The regulation schedule from Monday, August 21, 2017 to mid-December 2017 is as follows. ]
Image of regulation period

※ We will inform you about the regulation implementation date after mid December sequentially.

3 Construction overview

Joshinetsu Expressway This is the repair work for the "Akari-san" tunnel between Usui Karuizawa IC and Saku IC (Out-bound line).

Since the lower part of the tunnel is damaged and the pavement surface is being damaged, full-scale repair work will be carried out before the traffic is affected.

Since it takes time to reinforce the damaged lower part of the tunnel body and it is necessary to construct each lane, we will carry out the construction under the day and night continuous lane regulation.

By reinforcing the lower part of the tunnel body, the structure of the tunnel is strengthened, and damage to the paved road surface is repaired to improve safety.

We ask for your understanding and cooperation so that our customers can use the Expressway safely.

Image image of construction outline

State of actual construction

Of the 150m invert installation extension, about 20m was completed by July 2017.

Image image of actual construction
Partially repeat the work shown in the photo

Content of regulation

Image of regulation contents

The maximum speed is 50km/h in the lane regulation section.
In addition, the width of the lane at the construction site is narrow, so when using it, please follow the signs etc. on the site and drive safely.

4 How to obtain traffic information

(1) Road traffic information available before going out

  • Homepage dedicated to the repair work of Mt.
    (Provision of information such as regulation period and construction outline)
  • NEXCO東日本お客さまセンター(24時間、365日、お客さまの声をお聞きしています)
    ナビダイヤル 0570-024-024(24時間オペレーターが対応)
    または、03-5338-7524
  • For the latest regulatory information, see DraTra "Please refer to the.
  • NEXCO EAST Road Traffic Information Site "Dora Tora"
    (Provides traffic information for Expressway nationwide)
    [PC]
    [Mobile] http://m.drivetraffic.jp/
  • ハイウェイテレホン(5分毎に更新される最新情報を24時間提供)
    前橋局 027-252-1620
    長野局 026-278-1620
    (携帯電話・PHS短縮ダイヤル#8162
  • 日本道路交通情報センター(JARTIC)の道路交通情報
    全国共通ダイヤル 050-3369-6666(携帯短縮ダイヤル#8011
    ※全国どこからでも最寄りの情報センターに接続します。
    ※PHS、IP電話など一部の電話からはご利用できません。
    全国・関東甲信越情報 050-3369-6600
    ホームページ

(2) Road traffic information available during driving

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.
* Twitter's official account "NEXCO EAST (Kanto)" (@e_nexco_kanto ) Also distributes information.
Image image of Expressway renewal project

Expressway Renewal project
Now, bring safety and security to the next generation.
NEXCO EAST, in order to deliver safety and security to everyone,
Expressway We will work on the update and repair business.

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.