Daisan-Keihin Road Between Keihin Kawasaki IC and Tsuzuki IC (Out-bound line)
Notice of day and night lane regulation
2 weeks from Sunday, April 2, 2017, 8:00 to Saturday, April 15, 16:00, excluding some Saturdays and Sundays
"We will carry out lane regulation day and night, and repair bridges."
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- Daisan-Keihin Road Keihin Kawasaki IC-Tsuzuki IC (Out-bound line) Notice of day and night continuous lane regulation
The latest regulatory information isDraTraPlease see.
March 3, 2017
East Nippon Expressway Co., Ltd.
Keihin Administration Office
NEXCO EAST At Keihin Administration Office (Tsuzuki-ku, Yokohama, Kanagawa), Daisan-Keihin Road Keihin-Kawasaki Interchange (“IC”) to Tsuzuki IC will be undertaken for bridge repair work on April 2nd. From 8 pm Sunday to 8 pm Saturday 8 April, and from 8 pm Sunday 9 April to 16 pm Saturday 15 April, construction lane regulations will be implemented continuously during the day and night. To do.
Therefore, in order to minimize the impact on customers, we will carry out the construction while securing two lanes that can pass through during the construction period.
During the construction period, it is expected that there will be congestion and congestion on the Expressway, especially up to 3 km on weekday and Saturday evenings.
We apologize for any inconvenience caused to customers who use this section, but we ask for your understanding and cooperation so that you can use it with time when going out.
1 Day and night continuous lane regulation section and date and time, etc.
(1) Restricted section
Daisan-Keihin Road Between Keihin Kawasaki IC and Tsuzuki IC Out-bound 2.1km extension
(2) Regulation period
- period
- : From Sunday, April 2, 2017 8:00 to Saturday, April 8, 16:00
: From Sunday, April 9, 2017 8:00 to Saturday, April 15, 16:00
(Construction will not be carried out from 18:00 on Saturday, April 8, 2017 to 8:00 on Sunday, April 9) - Preparation day
- : From Sunday, April 16, 2017 8:00 to Saturday, April 22, 16:00
: From Sunday, May 14, 2017 8:00 to Saturday, May 20, 16:00 - section
- : Daisan-Keihin Road Keihin Kawasaki IC-Tsuzuki IC (Out-bound line)
Construction period calendar (April)
Construction period calendar (May)
- In case of stormy weather, construction will be postponed the next day or next week.
- In case of stormy weather, the decision to implement the construction will be made at 16:00 the day before the implementation.
- Please check NEXCO EAST Road Information Site "DraTra", highway telephone, etc. for the latest information such as the implementation decision on the day. [5. (2) Road traffic information that can be obtained before going out Refer to]
(3)Congestion Forecast
During the construction period, we anticipate congestion on weekdays and Saturdays. Especially on weekdays (peak hours 18:00 to 19:00) and Saturday (peak hours 16:00 to 17:00), traffic congestion of up to 3km is expected, so please take time to go out.
3 Traffic restrictions
During the bridge repair work, we will implement day and night continuous regulation to reduce the section of 3 Out-bound lanes to 2 lanes. The lane width is narrow in the construction section, so please drive carefully.
4 Construction overview
Daisan-Keihin Road Keihashi Kawasaki IC-Tsuzuki IC (Out-bound line) The bridge "Higashiyamada Viaduct" has deteriorated over the years, so the roadside environment and the running performance of the vehicle are improved. Then, we will carry out repair work on the bridge.
In this construction, the expansion and contraction device of the joint of the bridge will be removed to eliminate the joint.
In order to minimize the impact on our customers, we will regulate lanes day and night to ensure construction is safe, focused and efficient. We ask for your understanding and cooperation so that our customers can use the Expressway safely and comfortably.
* The photo is an example of construction at another bridge.
5 How to obtain traffic information
(1) Regulatory information
- A signboard will be posted on the rest facility, main line, etc.
- A banner will be posted on the overpass of Daisan-Keihin Road.
(2) Road traffic information that can be obtained before going out
- NEXCO EAST Customer Center
- Navi dial
- : 0570-024-024 (24 hours operator support)
- TEL
- :03-5338-7524(PHS、IP電話のお客さま)
- NEXCO EAST Road Traffic Information Site "Dora Tora"
[PC]
[Mobile] http://m.drivetraffic.jp/ - For the latest regulatory information, see DraTra "Please refer to the.
- ハイウェイテレホン
(5分毎に更新される高速道路の交通最新情報を自動音声で24時間提供)
京浜局 045-780-1620 - 日本道路交通情報センター(JARTIC)の道路交通情報
全国共通ダイヤル 050-3369-6666(携帯電話短縮ダイヤル#8011)
全国・関東甲信越情報 050-3369-6600
ホームページ【PC】
(3) Traffic information available while driving
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.