Between Daisan Daisan-Keihin Road Kohoku IC and Hodogaya IC
Notice of traffic closure at night

From Saturday, February 28 23:00 to 6:00 the next morning
From Saturday, March 7 23:00 to 6:00 the next morning
-Construction work will be carried out on a bridge that intersects with Daisan-Keihin Road road-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Daisan-Keihin Road Kohoku IC ~ Hodogaya IC between nighttime road closures Announcement

January 30, 2015
East Nippon Expressway Co., Ltd.
Keihin Administration Office

NEXCO EAST in Keihin management office (Yokohama City, Kanagawa Prefecture Tsuzuki-ku), Daisan-Keihin Road Kohoku interchange (IC) ~ Hodogaya between IC Daisan-Keihin Road capital to cross the Expressway Yokohama ring North line Kohoku junction (JCT) lamp We will build the bridge.

Along with that, from 23:00 on Saturday, February 28 to 6:00 the next morning, and from 23:00 on Saturday, March 7 to 6:00 the next morning, night traffic will be closed in the same section.

We sincerely apologize for the inconvenience, but we ask for your understanding and cooperation so that you may have time to go out.

Regarding the Metropolitan Expressway Yokohama Loop North Line, home page Please refer to the.

1 closed sections and date and time

(1) Closed section
Up and down line between Daisan Daisan-Keihin Road Kohoku IC and Hodogaya IC Extension of about 5.3km

Image images of sections, etc.

(2) Date and time

period:
Saturday, February 28, 2015 and Saturday, March 7
Preparation day:
Saturday, March 14th and Saturday, March 21st, 2015
time:
Every day from 23:00 to 6:00 the next morning (7 hours)

[Construction period calendar (February/March)]

Image of construction period calendar (February/March)
  • In case of stormy weather, the work will be postponed.
  • In case of stormy weather, the decision to stop at night will be made at 14:00 on the day of implementation.
  • Please check NEXCO EAST Road Information Site "DraTra", highway telephone, etc. for the latest information such as the implementation decision on the day. [Refer to 4. (2) Road traffic information available before going out]

2 Detour

The detour will be Route 2 and Prefectural Road 13 (Shin-Yokohama Street) (Shin-Yokohama Motoishikawa Line). If you use the detour route, it will take 25 to 30 minutes to detour, so please take time to go. (Attachment [PDF: 112KB])

Image of detour
  • You cannot use the Hazawa IC on Daisan-Keihin Road.
1.Customers using Daisan-Keihin Road ⇔ Shutoko Mitsuzawa Line
  • Please use Kohoku IC and Mitsuzawa Exit for detour.
2. Customers using the Daisan-Keihin Road ⇔ Hodogaya Bypass
  • For detours, please use Kohoku IC and Shin-Sakuragaoka IC.
3. Customers using Daisan-Keihin Road ⇔ Yokohama-Shindo Road
  • Please use Kohoku IC and Imai IC for detour.
4. Customers using Daisan-Keihin Road ⇔ Yokohama Yokosuka Road
  • Passengers using the Yokohama Yokosuka Road from the Daisan-Keihin Road (Out-bound line) toward Yokosuka are requested to make a detour from the Kohoku IC and then the Hodogaya Bypass Shin-Sakuragaoka IC again.
  • Yokohama Yokosuka Road (In-bound) to Daisan-Keihin Road are advised to re-enter from the Shin-Sakuragaoka IC for the Hodogaya Bypass and then from the Kohoku IC of Daisan-Keihin Road. Also, if you have flown into the Yokohama-Shindo Road, please have it flow out toward National Highway No. 1 (Yokohama National University).

3 Construction overview

With the construction of the Kohoku Junction (JCT) on the Shuto Expressway Yokohama Loop North Line, we will construct two Kohoku JCT Ramp Bridges that cross Daisan-Keihin Road. (See the figure below)

In order to minimize the impact on our customers when carrying out this construction, we will close the road at night when traffic is light, and carry out the construction safely, intensively and efficiently. We ask for your understanding and cooperation so that our customers can use the Expressway safely and comfortably.

Image image of Kohoku JCT completion forecast model drawing
Kohoku JCT completion expected model diagram (Shuto Express HP More excerpt :)
Image image of Kohoku JCT ramp bridge erection position photo
Kohoku JCT ramp bridge erection position current photo
(Taken from near Kohoku IC on Daisan-Keihin Road)
Image of construction road closure image
Construction road closure image

4 How to obtain traffic information

(1) Public information regarding suspension of traffic

  • We will post signs and posters at rest facilities.
  • Post banners on overpass bridges on Expressway.

(2) Traffic information that can be obtained before going out

  • NEXCO東日本お客さまセンター
    ナビダイヤル:0570-024-024 (24時間オペレーターが対応)
    TEL:03-5338-7524 (PHS、IP電話のお客さま)
  • NEXCO EAST Road Traffic Information Site "DraTra "
    [PC] http://www.drivetraffic.jp/
    [Mobile] http://m.drivetraffic.jp/
  • For the latest regulatory information, see DraTra "Please refer to the.
  • 日本道路交通情報センター(JARTIC)の道路交通情報
    全国共通ダイヤル 050-3369-6666(携帯電話短縮ダイヤル#8011)
    全国・関東甲信越情報 050-3369-6600
    神奈川情報 050-3369-6614
    ホームページ【PC】
  • ハイウェイテレホン(5分毎に更新される最新情報を24時間提供)
    京浜局 045-780-1620(携帯電話・PHS短縮ダイヤル #8162

(3) Traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    It can be obtained by VICS compatible navigation.
  • Highway Information Terminal (Traffic information will be announced on the TV screen in an easy-to-understand manner.)
    Daisan-Keihin Road Tsuzuki PA (above)
    Yokohama-Shindo Road Totsuka PA (above)
    Yokohama Yokosuka Road Yokosuka PA (above)
* Twitter's official account "NEXCO EAST (Kanto)" (@e_nexco_kanto ) Also distributes information.
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.