Congestion prediction and countermeasures for Expressway Golden Week (GW)

-Please cooperate in distributed use to alleviate traffic congestion-
Out-bound peaks may be Friday, May 3 and Saturday, May 4.
In-bound peaks are May 4th (Sat) and 5th (Sun)

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Congestion prediction and countermeasures for Expressway Golden Week (GW)

March 29, 2013
East Nippon Expressway Co., Ltd. Kanto Regional Head Office
Central Japan Expressway Tokyo Regional Head Office
Central Japan Expressway Co., Ltd. Hachioji Regional Head Office

NEXCO EAST Kanto Regional Head Office and NEXCO CENTRAL Tokyo Regional Head Office /Hachioji Regional Head Office, GW [11 days from April 26, 2013 (Friday) to May 6, 2013 (Monday)] Kanto Koshin region and Shizuoka Prefecture ( We have summarized the trends and countermeasures for traffic congestion (10 km or more) due to traffic concentration expected to occur on Expressway such as Tomei Toyokawa IC in Aichi prefecture).

Please refer to this traffic jam forecast to avoid peak traffic jams and adjust your departure times to help plan your trip. Although the forecast is made based on past GW traffic congestion and recent traffic conditions, the actual traffic congestion may differ from the forecast due to accidents, weather conditions, etc. Please check the traffic information in.

In addition, each Expressway company provides traffic congestion forecast information and road traffic information with various tools. Please use it when using the Expressway.

1 Congestion prediction

(1) Trend of traffic congestion

Congestion in the Tokyo metropolitan area this time is predicted to have peaks on the Out-bound line on Friday, May 3 and Saturday, May 4, and peaks on the In-bound line on Saturday, May 4 and May 5. Will be done.

We hope that you can shorten the time required by using the traffic congestion prediction and avoiding traffic congestion peaks, so please cooperate.

Image image of the tendency of congestion

  • Regarding the expected number of traffic jams on the Gaikan Expressway, the "outer direction" towards the Misato Minami IC is included in the "Out-bound direction", and the "inward direction" toward the Oizumi JCT is included in the "In-bound direction".

(2) Prediction of particularly long congestion (peak congestion length of 40 km or more)

Person
surface
peak
of time
time
・ Day of the week
Road name Top of traffic jam
(location)
Time zone peak
Times of Day
peak
of time
Congestion length
under
Ri
05/03 Fri Kan-Etsu Expressway Near the Hanazono IC Fukaya City, Saitama Prefecture 5:00

17:00
7 o'clock 50km
Up
Ri
April 29th Kan-Etsu Expressway Near Takasaka SA Higashimatsuyama City, Saitama Prefecture 14:00

23:00
18:00 45km
April 29th Tomei Expressway Near Yamato TN Yamato City, Kanagawa Prefecture 13:00

24:00
18:00 45km
05/03 Fri Tomei Expressway Near Toyokawa IC Toyokawa City, Aichi Prefecture 4:00

20:00
9 o'clock 40km
05/04 Saturday Kan-Etsu Expressway Near Takasaka SA Higashimatsuyama City, Saitama Prefecture 15:00

24:00
19o'clock 45km
05/05 day Tohoku Expressway Near Kamikawachi SA Utsunomiya City, Tochigi Prefecture 11:00
~
1:00 the next day
16:00 40km
05/05 day Kan-Etsu Expressway Near Takasaka SA Higashimatsuyama City, Saitama Prefecture 12:00
~
1:00 the next day
17:00 45km
05/05 day Tomei Expressway Near Yamato TN Yamato City, Kanagawa Prefecture 14:00
~
3:00 the following day
18:00 50km

For a list of major traffic jams (peak traffic congestion length of 10 km or more) on Expressway Kanto Koshin region and Shizuoka prefecture (including Tomei Toyokawa IC in Aichi prefecture) Attachment-1 [PDF: 145KB] Please refer to.

(3) Comparison of the number of traffic jams with last year's GW (April 26, 2012 (Thursday) to May 6, 2012 (Sunday))

The unit of the numerical value in the table is "times"

Traffic jam scale (1) Forecast for 2013 GW (2) Results for 2012 GW* Difference ((1)-(2))
going down going up Total going down going up Total going down going up Total
Number of traffic jams over 10km 61 80 141 52 83 135 9 -3 6
Of which, the number of traffic congestions of 30 km or more 4 11 15 4 13 17 0 -2 -2

* Including the impact of accidents.

2 How to obtain road traffic information

For how to obtain real-time road traffic information and traffic congestion prediction information, Attachment-2 [PDF: 141KB] Please refer to.

3 Customer Service Initiatives (Countermeasures against congestion)

We will work to strengthen our customer services, including measures to alert people to the rear end of a traffic jam, staff parking lots in the service area, install temporary toilets, and secure parking for large vehicles.

Items Main measures unit Countermeasure planned quantity
Main line section (1) In-bound reminder the rate of decrease in the slope, etc. Location 33
(2) Calling attention to the rear end of a traffic jam Location 87
SAPA (3) Placement of parking lot organizers at rest facilities Total number of people/day 4,291
(4) Installation of temporary toilet Basis 115
(5) Secure parking for large vehicles Location 59

[Countermeasure example]

Image of countermeasure example

~ Requesting customers to drive safely ~

  • Expressway has seen a sharp increase in the number of people being hit by accidents.
    If it is unavoidable to go out of the car, signal the car behind you with a hazard or triangular plate, evacuate to a safe place, and call by emergency telephone etc.
  • Driving for a long time causes an accident
    If you feel drowsiness or tired while driving, please do not overdo it and take an early break.
  • Please check the car before driving to prevent troubles during driving.
  • Please wear all seat belts, including the back seats.
  • Insert the ETC card securely
  • Please drive the ETC lane at less than 20km/h
  • Please be careful of a rear-end collision at the end of a traffic jam
  • Before refueling or using the toilet, take an appropriate break as early as possible to drive safely.
  • For abnormalities on the road, make an emergency call or road emergency dial # 9910 Please let us know

~ Requesting our customers to cooperate in alleviating traffic congestion ~

  • Please use the traffic congestion prediction information and avoid peak times.
  • In-bound as well as attention to the slowdown in the hill, take the vehicle-to-vehicle distance to enough, except when overtaking Please use the driving lane
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.