Request for detour due to nighttime construction

~Yokohama-Shindo Road We will carry out nighttime construction on the connecting road of Hodogaya IC~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Request for detour due to nighttime construction

October 27, 2008
East Nippon Expressway Co., Ltd.
Keihin Administration Office

NEXCO EAST Keihin Management Office (Tsuzuki-ku, Yokohama, Director: Jun Maekawa) Yokohama-Shindo Road Hodogaya Interchange (IC), Yokohama-Shindo Road (In-bound communication path from the line) to the Metropolitan Expressway Kanagawa No. 2 Mitsuzawa line direction At night, we will repair the damaged pavement and perform nighttime construction to improve riding comfort. In this construction, since the pavement will be removed and restored in places where the width of the road is narrow, it will not be possible to access the connecting road, so we will implement detour restrictions during the construction period.

To obtain information such as the decision on the day before going out, please contact NEXCO EAST Customer Center (TEL: 0570-024-024), Japan Road Traffic Information Center (TEL: 0570-01-1011), etc. (See Attachment-1 [PDF: 16KB])

We apologize for the inconvenience, and we appreciate your understanding and cooperation. When you go out, please allow yourself some time.

1 Construction section and date and time

See Attachment-2 [PDF: 998KB]

(1) Section

Yokohama-Shindo Road Hodogaya IC C lamp

  • Connecting route from the Yokohama-Shindo Road (In-bound line) to the Metropolitan Expressway Kanagawa No. 2 Mitsuzawa Line

(2) Date and time

Period: Monday, November 10, 2008-Friday, November 14, 2008
Time: Every night from 21:00 to 5:30 the next morning (8 hours 30 minutes)

Image image of 4 nights from 21:00 on Monday, November 10, 2008 to 5:30 the next morning (8 hours 30 minutes)

  • In order to ensure the advance preparation and traffic safety, in each work day, from 19 pm Yokohama-Shindo Road In-bound make the lane restrictions in the line-to-line new Hodogaya IC ~ Hodogaya IC.
  • The decision to implement the detour regulation will be made at 16:00 in the evening of the day.
  • The date when the detour regulation ends may change depending on the weather.

2 Detour

See Attachment-2 [PDF: 998KB]

(1) Detour 1 [wide area detour]

Customers who use the Metropolitan Expressway Kanagawa No. 2 Mitsuzawa Line from Totsuka/Kawakami/Imai areas of Yokohama-Shindo Road, Yokohama Yokosuka Road, Hodogaya Bypass and Hodogaya IC connecting route from Shin-Hodogaya IC via Kariba IC Please make a detour to the Kanagawa No. 3 Kariba Line on the Shuto Expressway.

(2) Detour 2 [nearest detour]

Yokohama-Shindo Road Hodogaya IC, exit from National Road No. 1, turn right at the Mitsuzawa Uemachi intersection from National Road No. 1, and take the Shin-Yokohama-dori to the Metropolitan Expressway Kanagawa No. 2 Mitsuzawa Line Mitsuzawa entrance. It usually takes about 5 minutes). There is no additional charge for the detour.

During the nighttime construction period, due to the detour of (2) above, around 12:00 to 22:00 before and after the start of the connecting road, 1km from the Yokohama-Shindo Road In-bound Line and the Hodogaya IC "Route 1 Exit" We are predicting a degree of congestion.

For how to obtain road traffic information, see ( See Attachment-1 [PDF: 16KB] ).

3 Construction overview

See Attachment-3 [PDF: 37KB]

We will repair the pavement of the Hodogaya IC connecting road.

4 Inquiries about construction

From 17:20 on the construction day to 9:00 the next morning, we will set up a customer inquiry window regarding the construction.

Contact: 0120-716-316 (toll free)

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.