[E5] Do-O Expressway and [E5A] Sasson Expressway
Notice of renewal construction schedule
- Corporate Top
- Press Room
- Press Release Hokkaido office
- [E5] Do-O Expressway and [E5A] Sasson Expressway Renewal Construction Notice
The latest regulatory information isDraTraPlease see.
April 10, 2020
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Atsubetsu-ku, Sapporo) will inform you about Expressway renewal work that will start from May to July 2020 on the E5 Do-O Expressway and the E5A Sasson Expressway. We will inform you again about what will start after August.
Renewal work is necessary for the safe and secure use of Expressway. We will do our best to minimize the inconvenience to our customers, so we ask for your understanding and cooperation.
1. Location Map/Traffic Regulation Schedule
number | section | Regulation type | period | Congestion Forecast | Details |
---|---|---|---|---|---|
① | Asari IC - Zenibako IC (up and down lines) |
All day lane regulation | May 9th to July 13th | None | Attachment-1 [PDF: 347KB] |
② | Chitose Eniwa JCT - New Chitose Airport IC (up and down lines) |
All day lane regulation | May 12th to August 4th | None | Attachment-2 [PDF: 319KB] |
③ | Shiraoi IC - Tomakomai West IC (up and down lines) |
All day lane regulation | May 9th to August 4th | None | Attachment-3 [PDF: 257KB] |
- Saturday, Sunday and public holidays are also regulated all day.
- The traffic regulation period may change depending on the progress of construction.
- Please check the latest traffic information before departure, as actual traffic conditions may differ from forecasts due to accidents, weather, etc.
2. Construction details
All of the construction we will inform you about this time is floor slab replacement work. In this work, the concrete floor slabs that have been damaged due to deterioration and the increase in the number of large vehicles will be replaced with new, more durable prestressed concrete slabs. In addition, high-performance floor slab waterproofing is applied to the waterproof layer to prevent deterioration of the floor slab.
Construction image photograph
3. Requests when using
- The construction section will have lane restrictions throughout the day. We do not anticipate traffic jams, but congestion is expected in the mornings, evenings, and on holidays, so please allow yourself plenty of time to get out.
- Since the lanes and road shoulders are narrow, please observe the speed limit when driving, secure a distance between vehicles, and be careful of rear-end collisions. In addition, lanes will change significantly before and after the restricted section, so please follow the local guidance signs.
- Vehicles for construction work may enter and leave the area around the construction site, so please be careful when traveling ahead.
- During the construction period, we will provide traffic congestion information using LED information boards, provide construction regulation information using road information boards and road signs, and call attention to driving safely. Please check this information before driving and drive safely.
Image of information provision image around the construction site
Four. How to get traffic information
- "DraPla", a site full of useful information on Expressway nationwide
【address】
PC versionmobile versionhttps://m.driveplaza.com/smartphonehttps://www.driveplaza.com/smp/ - Expressway traffic information service “Drive Traffic (DraTra)”
It provides real-time road traffic information.
【address】
mobile versionhttps://m.drivetraffic.jp/smartphonehttps://www.drivetraffic.jp/smp/ - NEXCO東日本お客さまセンター
24時間365日オペレーターが対応いたします。
【電話番号】0570-024-024
または 03-5308-2424 - 日本道路交通情報センター(JARTIC)の道路交通情報
https://www.jartic.or.jp/
050-3369-6760
(北海道地方・高速情報) - LINE Official Account
- We inform you about the traffic closure situation in the NEXCO EAST jurisdiction.
[Search] Search by "NEXCO EAST"
[ID] @e-nexco - Twitter official account
"NEXCO EAST (Hokkaido)" (@e_nexco_kita) distributes Hokkaido Expressway information. - Highway radio (AM1620kHz)
The section on the broadcast is indicated by the signs on the Expressway. - Highway Information Terminal
Wide-area road traffic information is notified on the monitor screen installed in SA / PA.
Expressway renewal project
Now, safety and security to the next generation.
In order to deliver safety and security to everyone, NEXCO EAST will work on large-scale renewal and repair projects for Expressway.
Or search for "Fast Renewal".
The NEXCO EAST Group has positioned the period from 2021 to 2025 as "a period that contributes to the achievement of the SDGs and transforms into a new future society," and is making various efforts.
We believe that this "renewal work" initiative will contribute to the SDGs goals No. 8, 9, and 11 as business activities that lead to the development of safe, secure, and reliable infrastructure.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.