Expressway traffic conditions during the Obon period (breaking news)
[Hokkaido version]

  • Corporate Top
  • Press Room
  • Press Release Hokkaido office
  • Expressway traffic conditions during the Obon festival (breaking news) [Hokkaido version]

PDF version [PDF: 285KB]

August 17, 2020
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office

NEXCO EAST Hokkaido Regional Head Office Office (Atsubetsu-ku, Sapporo City) summarizes the traffic situation in Hokkaido during the Bon Festival period (Wednesday, August 10, 2022-Tuesday, August 16, 2021, 7 days). so I will let you know.

  • The average daily traffic volume was 89% compared to the same period in 2019 (before the corona disaster).
    (Increased to 137% compared to 2021).
  • The number of traffic jams of 1 km or more was 9 times, which was ▲ 4 times compared to the same period in 2019.
    (+8 times compared to 2021).
  • The maximum length of traffic congestion was 16.0km on August 14th (Sunday) around 17:10 due to heavy traffic on the E38 Tomamu Interchange (IC) → Doto Expressway Interchange (In-bound, towards Sapporo). .

1. 1. Comparison period

①FY2022:
August 10, 2020 (Wednesday) to August 16, 2020 (Tuesday)
7 days
2019:
August 8th (Thursday), 1st 2019 Sunday, August 18th, 1st 2019
11 days
③ (Reference) 2021:
August 6th (Friday), 3rd year of Reiwa-Monday, August 16th, 3rd year of Reiwa
11 days

2. Average daily traffic volume *

①FY2022 2019 Comparison ① / ② reference
③FY2021 Comparison ① / ③
14,800 units/day 16,700 units/day 89% 10,800 units/day 137%
  • Average value between E5 Hokkaido Expressway Fukagawa Junction (JCT) and Fukagawa IC and E38 Doto Expressway Chitose Eniwa JCT and Chitose Higashi IC

3. 3. Congestion situation

①FY2022 2019 Comparison ① / ② reference
③FY2021 Comparison ① / ③
9 times 13 times ▲ 4 times Once +8 times

<< Particularly long traffic congestion (Worst 5) >>

[Reiwa 4th year]

Ranking Congestion length Date and time Section (IC omitted) lead Factor
1 16.0km Sunday, August 14, around 17:10 E38 Doto Expressway
Tomamu → Mukawa Hobetsu (In-bound for Sapporo)
Near Hobetsu Tunnel Traffic concentration
2 3.5km Saturday, August 13, around 10:10 E5A Sasson Expressway
Sapporo Kita→ Out-bound (Outbound/Sapporo JCT direction)
Near Fushiko IC Traffic concentration
3 2.3km Saturday, August 13, around 9:30 E5A SHIRIBESHI EXPRESSWAY
Otaru Shioya→Yoichi (In-bound for Yoichi)
Near the Yoichi main line tollgate Traffic concentration
4 1.6km Saturday, August 13, around 10:40 E5A Sasson Expressway
Otaru JCT → Asari (In-bound for Otaru)
Asari IC Traffic concentration
5 1.5km Around 7:30 on Friday, August 12 E5A Sasson Expressway
Sapporo Kita→Fushiko (Out-bound /Sapporo JCT direction)
Around W5.5KP Broken car

[2019]

Ranking Congestion length Date and time Section (IC omitted) lead Factor
1 20.7km August 14 (Wednesday) around 17:50 E38 Doto Expressway
Tomamu → Mukawa Hobetsu (In-bound for Sapporo)
Near Hobetsu Tunnel Traffic concentration
2 7.2km Sunday, August 11, around 10:40 E5A SHIRIBESHI EXPRESSWAY
Otaru Shioya→Yoichi (In-bound for Yoichi)
Near the Yoichi main line tollgate Traffic concentration
3 6.5km August 11 (Sun) around 10:55 E5A Sasson Expressway
Shinkawa→ Out-bound (Outbound/Sapporo JCT direction)
Near Fushiko IC Traffic concentration
4 4.7km Saturday, August 10, around 10:40 E5A Sasson Expressway
Sapporo Kita→Fushiko (Out-bound /Sapporo JCT direction)
Near Fushiko IC Traffic concentration
5 4.0km Monday, August 12, around 9:20 E5A Sasson Expressway
Sapporo Kita→ Out-bound (Outbound/Sapporo JCT direction)
Near Fushiko IC Traffic concentration

(Reference) [Reiwa 3rd year]

Ranking Congestion length Date and time Section (IC omitted) lead Factor
1 2.8km Around 10:50 on Friday, August 6 E5 Hokkaido Expressway
Eniwa →Kitahiroshima (Out-bound /Sapporo direction)
Around S15.2KP accident
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.