Notice of night traffic closure on Expressway in Hokkaido

-Road maintenance and repair work-

August 8, 2017
East Nippon Expressway Co., Ltd.
Hokkaido office

NEXCO EAST Hokkaido Branch Office (Sapporo City Atsubetsu Ward) will conduct nighttime traffic closure accompanying each inspection work, road surface repair work, etc. in order to make it possible for customers to use the expressway safely, securely and comfortably.

We apologize for the inconvenience, and we appreciate your understanding and cooperation.

1 closed section and period

Road name section period Main construction contents Attachment
E5
Do-O Expressway
Toyoura IC ⇔ Muroran IC
(Both directions)
Aug. 21 (Mon) - Aug. 29 (Tue)
[7 nights except Saturday and Sunday]
Every day from 20:00 to 6:00 the next morning
Pavement repair work
Inspection of each structure
Each equipment inspection
Flyer-1 [PDF: 247KB]
E38
Doto Expressway
Oiwakecho​ IC ⇔ Yubari IC
(Both directions)
Aug. 28 (Mon) - Sep. 6 (Wed)
[7 nights except Friday, Saturday and Sunday]
20:00 - 6:00
Pavement repair work
Inspection of each structure
Each equipment inspection
Leaflet-2 [PDF: 272KB]
Chitose HigashiIC ⇔ Oiwakecho IC
(Both directions)
Sep. 7 (Thu)
[1 night]
20:00 - 6:00
Inspection of each structure
Chitose Eniwa JCT ⇔ Chitose East IC
(Both directions)
Sep. 11 (Mon) - Sep. 13 (Wed)
[3 nights]
20:00 - 6:00
Pavement repair work
Inspection of each structure
  • In case of bad weather, it will be postponed at the same time from the next day.
  • Please see the attached leaflet for detours and spare days for postponement.

2 Main work contents

  • Road surface repair work
    We will repair the places where cracks and steps on the pavement surface are noticeable.

<Road surface repair work>

Image of road surface repair work

  • Inspection of each structure and equipment
    We will carry out inspections to maintain a safe road environment.
<Inspection of each structure>
Image image of each structure inspection
<Each equipment inspection>
Image image of each equipment inspection

3 Information during the construction period

Construction regulation information is provided through the following media.

  1. the Internet
    • For the latest regulatory information, see DraTra "Please refer to the.
    • Drive traffic ] For the latest traffic information.
  2. Flyers, posters, highway information terminals
    Each service area / parking area of ​​toll roads, toll office office, NEXCO EAST Hokkaido branch office each management office etc. distributed and posted.
  3. phone
    • 『NEXCO東日本お客さまセンター』
      24時間365日、高速道路に関する様々なお問合せにお答えします。
      電話番号
      0570-024-024 (PHS・IP電話のお客さま:03-5338-7524
    • 『ハイウェイテレホン』:リアルタイムの交通情報(5分更新)を24時間提供しています。
      電話番号
       011-896-1620(札幌)
       0166-54-1620(旭川)
       0143-59-1620(室蘭)
       0155-42-1620(帯広)
       (注) おかけ間違いのないようにご注意ください。
      #8162」に携帯電話でおかけいただくと、全国どこでも、その場所から最も近い地域の最新の高速道路状況を自動音声で提供します。
    • 『日本道路交通情報センター』:最新の交通情報を提供しています。
      電話番号
      050-3369-6760
  4. Road traffic information available while driving
    • Road information board
    • Highway radio (1620kHz)
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.