Congestion prediction and avoidance on Expressway during Obon period [Hokkaido version]

-Peak forecast is August 13th (Sunday) Please cooperate with distributed use to reduce congestion-

  • Corporate Top
  • Press Room
  • Press Release Hokkaido office
  • Congestion prediction and avoidance on Expressway during Obon period [Hokkaido version]

You are viewing a page with old information.
For the latest information, see Here Please check from.

July 14, 2017
East Nippon Expressway Co., Ltd.
Hokkaido office

NEXCO EAST Hokkaido Regional Head Office (Sapporo City Atsubetsu Ward) is congested due to traffic congestion on the Hokkaido Expressway during the Obon period [Saturday, August 5, 2017 to Wednesday, August 16, 2017: 12 days] I have summarized the forecast and countermeasures, so I will inform you.

Please refer to this traffic congestion forecast to avoid peak traffic congestion and adjust your departure time to make a comfortable travel plan. Also, please be sure to check the latest traffic information before departure, as the actual traffic congestion may differ from the forecast due to accidents or weather conditions.

1 Congestion prediction and request for distributed use

  • During the Obon period, we predict that there will be a lot of traffic congestion on Sunday, August 13.
    [Traffic occurrence tendency is as shown below]
  • Prediction of the longest congestion in Hokkaido [Forecasting congestion and congestion See Attachment 1 [PDF: 48KB]]
    August 14 (Mon)
    E38 Doto Expressway Memuro IC (Interchange) ⇒ Tomamu IC (Sapporo direction)
    Approximately 25km starting from near Hirouchi Tunnel
    Cause: Traffic concentrate + long is directed to Doo from eastern In-bound rate reduction due to slope section and the tunnel consecutive sections
  • When departing, please avoid the congestion by shifting the peak day and time of expected congestion.

Image image of the number of traffic congestion predictions (congestion traffic congestion of 1km or more)

Prediction of major traffic jams over 10 km in Hokkaido

date Route direction section Top of traffic jam Congestion length
8/13 (Sun) Do-O Expressway Asahikawa Ebetsu West IC → Iwamizawa IC Kurizawa Bus Stop 10km
8/13 (Sun) Doto Expressway Obihiro Oiwake-cho IC → Mukawa Hobetsu IC Oyubari Tunnel 10km
8/13 (Sun) Doto Expressway Obihiro Mukawa Hobetsu IC → Tomamu IC East Shimukappu Tunnel 20 km
8/13 (Sun) Doto Expressway Sapporo Tokachi Shimizu IC → Tomamu IC Hirouchi Tunnel 10km
8/14 (Mon) Doto Expressway Sapporo Memuro IC → Tomamu IC Hirouchi Tunnel 25km
8/15 (Tue) Doto Expressway Sapporo Shimukappu IC → Mukawa Hobetsu IC Hobetsu Tunnel 10km
8/15 (Tue) Doto Expressway Sapporo Memuro IC → Tomamu IC Hirouchi Tunnel 15km

Comparison of the number of traffic jams with the Bon festival period of the previous year

Traffic jam scale 2017 [Forecast]
8/5 (Sat)-8/16 (Wed)
2016 [results]
8/6 (Sat)-8/17 (Wed)
Number of traffic jams 14 times 16 times
5km or more 10 times 10 times
  • Number of traffic congestion due to traffic concentration

(Reference) Obon period calendar

(Reference) Image image of the Obon period calendar

2 Measures against traffic congestion and congestion

Attachment 2 [PDF: 334KB] reference

Regarding the measures against traffic congestion and congestion during the Obon period, we will implement the following measures to improve safety and comfort.

  • Providing traffic congestion information and warnings by using marked vehicles at major traffic congestion points and at the end of traffic congestion
  • Placement of parking lot organizers at rest facilities
  • Installation of temporary toilet at rest facility
  • Raising the illuminance of tunnel lighting and alerting for gradient changes in some tunnels
    (Prevents unintentional slowdown)

Request from NEXCO EAST Hokkaido branch office

  • Since National Highway 274 is closed due to the disaster, alternative route measures between Doto Expressway Shimukappu IC and Tokachi Shimizu IC are being implemented as alternative routes under certain conditions. .. For customers using Doto Expressway, in order to secure the traffic of Doto Expressway, we will prevent roadblocks due to accidents and breakdowns, and cooperate with safe driving through a comfortable driving plan. please.
  • Please use the traffic jam prediction information to plan a comfortable trip, such as avoiding the time when a traffic jam is predicted or avoiding IC.
  • Please keep a sufficient distance between cars and drive at a safe speed. If you feel tired, don't overdo it and try to take an early break at the rest facility.
  • In order to prevent a rear-end collision in a traffic jam section, if you confirm a traffic jam ahead, please cooperate with us by turning on the hazard lamp and signaling the following vehicle.

Providing road traffic information

Road traffic conditions may change significantly due to accidents and weather. Please check the latest road traffic information before departure.

  • Expressway traffic information service "Drive Traffic (DraTra)"
    Expressway and real-time road traffic conditions and congestion prediction information, offers on the Internet. It can be viewed from a computer, tablet, mobile phone, or smartphone terminal. Please use the Expressway traffic information service provided by NEXCO EAST.
    For PC
    For smartphones and tablets http://www.drivetraffic.jp/smp/
    For mobile phones http://m.drivetraffic.jp/
    • When you access "DraTra", the top page tailored to your device will be displayed. Please note that the PC page may be displayed depending on the device.
  • ハイウェイテレホン
    札幌局:011-896-1620
    室蘭局:0143-59-1620
    旭川局:0166-54-1620
    帯広局:0155-42-1620
    携帯電話からは『#8162』で最寄の高速道路のハイウェイテレホンを聞くことが出来ます。
  • 日本道路交通情報センター (JARTIC)
    電話番号:050-3369-6760
    ホームページ
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.