Doto Expressway Notice of between Oiwake-cho interchange - Yubari Interchange one side alternating traffic regulation

~We will carry out disaster prevention work for the Kuriyama Tunnel~

  • Corporate Top
  • Press Room
  • Press Release Hokkaido office
  • Doto Expressway Oiwake-cho IC ~ Yubari Notice of IC between one side alternating traffic regulation

November 9, 2009
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office

NEXCO EAST Hokkaido Regional Head Office (Sapporo Atsubetsu-ku, Regional Head Office length: Hiromi Yamamoto), the Doto Expressway between Yubari IC from Oiwake-cho interchange (IC), in order to ensure a safe and comfortable way, "one side alternating traffic as follows: We will inform you that construction will be carried out according to "regulations".

We apologize for the inconvenience and ask for your understanding and cooperation.

In case of bad weather, it will be postponed, so please check the NEXCO EAST Customer Service Center, Japan Road Traffic Information Center, Highway Telephone, information board, etc. for traffic regulation status.

1 Construction content and construction period

It is a one-way alternating traffic regulation due to the construction of disaster prevention measures for the Kuriyama Tunnel.

[Work content]
Concrete will be placed on the Sabo dam installed at the top of the Kuriyama tunnel.
【section】
Oiwake IC-Yubari IC (upper and lower lines)
【period】
Tuesday, November 17, 2009, from 9am to 5pm
  • In case of bad weather, it will be postponed at the same time from the next day. (Except Saturday and Sunday)
[Regulation extension]
The regulatory extension is approximately 2.2km.
There is a temporary stop on the main line and a maximum waiting time of about 10 minutes.
Please drive safely by following the information boards, regulatory signs, and guides.

[Construction period calendar]

Calendar: Tuesday, November 17, 2009 Image image from 9:00 to 17:00

2 Information during the construction period

Construction regulation information is provided through the following media.

(1) Internet

(2) Flyers, posters

It is distributed and posted at each service area/parking area on the Expressway, at the toll gate office, at the Sapporo Administration Office of the Hokkaido Regional Head Office NEXCO EAST.

(3) Telephone

  • "NEXCO EAST Customer Center"
    We will answer various inquiries regarding Expressway 24 hours a day, 365 days a year.
    Telephone Number
    0570-024-024 (PHS・IP電話のお客さま:03-5338-7524
  • "Highway Telephone"
    We provide real-time traffic information (5 minutes update) 24 hours a day.
    Telephone Number
    011-896-1620(札幌)
    0166-54-1620(旭川)
    0143-59-1620(室蘭)
    0155-42-1620(帯広)
    (注)おかけ間違いのないようにご注意ください。
  • "Japan Road Traffic Information Center"
    We provide the latest traffic information.
    Telephone Number
    011-891-8111(午前7時~午後7時)

(4) Road traffic information available while driving

  • Road information board