Doto Expressway (between Obihiro JCT and Otofuke Obihiro IC)
-Implementation of alternate traffic regulations-
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Doto Expressway (between Obihiro JCT and Otofuke Obihiro IC)
May 2, 2006
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Sapporo City Atsubetsu-ku, Regional Head Office president: Katsuji Kubotera), alternate traffic is carried out between the Otohiro Doto Expressway Obihiro Junction (JCT) and the Otofuke Obihiro Interchange (IC) to repair traffic accidents at traffic safety facilities. We will inform you of the regulations.
In addition, this alternate traffic regulation was postponed because of the work to recover the slope disaster due to the heavy rain that occurred from April 20 to 21, 2006.
We apologize for the inconvenience, but we appreciate your understanding and cooperation.
In case of bad weather, it will be postponed the next day, so please check the highway telephone and information board for the status of traffic regulation due to construction.
1 Regulation date and time
Wednesday, May 10, 2006 20:00 to 7:00 the following day
*However, in case of bad weather etc., it will be postponed the next day
2 Control points
Doto Expressway between Obihiro JCT and Otofuke Obihiro IC
3 Extension of regulations
The maximum length of regulation is approximately 1.0km.
There is a temporary stop on the main line and a maximum waiting time of about 5 minutes.
Please drive safely by following the information boards, regulatory signs, and guides.
4 Construction content
Restoration of guard fence
5 Location map
NEXCO EAST Hokkaido Highway Telephone (The latest information on Expressway will be announced 24 hours a day.)
Sapporo TEL 011-896-1620
Muroran TEL 0143-59-1620
Asahikawa TEL 0166-54-1620
Obihiro TEL 0155-42-1620