​ Traffic situation on highway in Bon Festival (preliminary report) 【NEXCO EAST Edition】

  • Corporate Top
  • Press Room
  • Press Release Headquarters
  • ​ Traffic situation on highway in Bon Festival (preliminary report) 【NEXCO EAST Edition】

PDF version [PDF: 1.1KB]

August 17, 5th year of Reiwa
East Nippon Expressway Co., Ltd.

NEXCO EAST (Chiyoda-ku, Tokyo) has summarized the traffic conditions during the Obon period [Wednesday, August 9, 2020 to Wednesday, August 16, 2023: 8 days]. To do.

  • Average daily traffic was 113% compared to the same period last year.
  • There were 82 traffic jams of 10km or more, 134% of the same period last year.
  • The number of traffic jams over 30 km was 6 times, 200% compared to the same period last year.
  • The maximum traffic jam length was 36.7 km, which occurred around 8:35 on Friday, August 11, near the Yaita Kita PA on the E4 Tohoku Tohoku Expressway (Out-bound line).

1. 1. Comparison period

  1. Reiwa 5 [Wednesday, August 9, 2023 to Wednesday, August 16, 2023: 8 days]
  2. 2020 [August 10, 2020 (Wednesday) to August 17, 2020 (Wednesday): 8 days]

2. Traffic volume

(1) 2020 results (2) 2020 results Contrast (1) / (2)
Average daily traffic volume * 1
(All cars)
37,800 units/day 33,400 units/day 113%
(Small car) (Large car) 32,700 5,100 28,700 4,700 114% 109%
Maximum daily traffic 46,300 units/day 38,000 units / day 122%

*1: For details, please see Attachment-1 [PDF: 260KB]

3. 3. Congestion situation

(1) 2020 results (2) 2020 results Contrast (1) / (2)
Traffic congestion of 10 km or more 82 times 61 times 134%
Traffic congestion of 30 km or more 6 times 3 times 200%

Especially long traffic congestion place (3rd worst by direction)

*2: IC: interchange, JCT: junction, SA: service area, PA: parking area, TN: tunnel

Image image of [2020]
[Reiwa 4] image image

Four. Daily traffic conditions

  • Traffic volume and congestion peaked on August 11th (Friday) for Out-bound direction, and on August 13th (Sunday) and 14th (Monday) for In-bound direction.

[Out-bound]

[Out-bound] Image of traffic volume
[Out-bound] Image of the number of traffic jams (10km or more)

[In-bound]

[In-bound] Image of traffic volume
[In-bound] Image of the number of traffic jams (10km or more)

Reference material

Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.