Closure section due to typhoon No. 19 and prospect of cancellation (16:15 on October 13)
- Corporate Top
- Press Room
- Press Release Headquarters
- Closure section due to typhoon No. 19 and prospect of cancellation (16:15 on October 13)
October 13, 1st 2019
East Nippon Expressway Co., Ltd.
Due to the effect of Typhoon No. 19, there are sections that are closed due to restoration and safety confirmation work.
Passengers using the Expressway are advised to check the latest traffic conditions before going out.
1 closed section
Attached figure [PDF: 306KB] Street
2 Outlook for suspension of traffic closure
The cancellation prospects at this time are as follows, but they may be changed depending on the status of restoration work.
Also, please note that the following interchanges cannot continue to be used due to flooding.
[1] Sections targeted for cancellation by evening
Route name | section |
---|---|
Joshin-Etsu Expressway | Saku IC-Sakagi IC |
Chubu Odan Expressway | Saku Komoro JCT-Saku Kita IC |
Ken-o Expressway | Akiruno IC-Central Tsurugashima IC |
[2] Sections targeted for cancellation by the end of the day
Route name | section |
---|---|
Yokohama Yokosuka Road | Kariba IC-Mabori Kaigan IC |
Kamariya JCT-Namiki IC | |
Tohoku Expressway | Shirakawa IC-Izumi IC |
Sendai-Nanbu Road | Yamada IC-Sendai Minami IC |
Yamagata Expressway | Murata JCT-Miyagi Kawasaki IC |
[3] A section for which a cancellation target is being considered because a field survey is underway.
Route name | section |
---|---|
Joshin-Etsu Expressway | Matsuida Myoyoshi IC-Saku IC |
[4] Interchanges that cannot be used
Route name | name |
---|---|
Tohoku Expressway | Iwatsuki IC Kasukabe exit ramp closed (Available for Omiya area) |
Shirakawa Central SIC closed | |
Sendai-Tobu Road | Closed Tagajo IC |
Joban Expressway | Mitokita SIC closed |
Ken-o Expressway | Sakado IC closed |
Kita-Kanto Expressway | Ota Kado Door SIC West exit lamp closed |
Joshin-Etsu Expressway | Obuse SIC closed |
3 Damage situation
Attachment [PDF: 488KB] As above, we have confirmed damage such as landslides and fallen trees and scattered branches and leaves.
We are proceeding with recovery and safety confirmation work at these locations, but it is expected that it will take some time before the suspension of road closures is released.
We apologize for the inconvenience and ask for your understanding and cooperation.
Information on Tohoku Regional Development Bureau
Latest traffic conditions
- Road traffic information NOW !! -Japan Road Traffic Information Center
- Drive traffic (PC / smartphone)
- Drive traffic (mobile)
- NEXCO EAST (road disaster prevention information) Official Twitter
- NEXCO EAST (Hokkaido) Official Twitter
- NEXCO EAST (Tohoku) Official Twitter
- NEXCO EAST (Kanto) Official Twitter >
- NEXCO EAST (Niigata) Official Twitter
- Road traffic information available while driving
・ Road information board
・ Highway radio (AM1620kHz)
Broadcasting sections are indicated by signs on the Expressway
・ Highway Information Terminal
Wide-area road traffic information is provided on the monitor screens installed in SA / PA.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.