Congestion prediction on Expressway during Golden Week [national version]

  • Corporate Top
  • Press Room
  • Press Release Headquarters
  • Congestion prediction on Expressway during Golden Week [national version]

March 28, 2014
East Nippon Expressway Co., Ltd.
Central Japan Expressway Co., Ltd.
West Japan Expressway Co., Ltd.
Honshu-Shikoku Expressway Co., Ltd.
(Public foundation) Japan Road Traffic Information Center

NEXCO EAST / NEXCO CENTRAL / NEXCO WEST /JB Motoshi Expressway/(public interest incorporated foundation) Japan Road Traffic Information Center Golden Week period [12 days from Friday, April 25, 2014 to Tuesday, May 6] Expressway 's traffic congestion forecast is summarized.

For customers using Expressway, For example, staggering the dates to be moved, staggering the departure time before or after the expected traffic jam, etc. Please avoid using the traffic.

Congestion trends during Golden Week

  • Both upper and lower lines, A lot of traffic jams occurred during the last 4 consecutive holidays I predict.
  • Of the traffic congestion forecasts of 10 km or more, compared to the Out-bound line, In-bound A lot of traffic congestion on the line I predict.

1 Congestion prediction

Peak day (the day when it is predicted that there will be many congestions of 10 km or more)
[Out-bound line]: Saturday, May 3
[In-bound Line]: May 4th (Sun), 5th (Mon)

Congestion forecasts over 10km Total number of vertical lines 355 times

Image image of the number of times of traffic congestion prediction of 10 km or more

Prediction of particularly long traffic jams for each company

IC: Interchange, PA: Parking area, JCT: Junction, SA: Service area, TN: Tunnel

Company classificationVertical lineRoad nameCongestion peak date and timePeak traffic congestionTraffic jam location
East JapanOut-bound lineKan-Etsu ExpresswayMay 3 (Sat) around 8:0050kmNear Hanazono IC
In-bound lineKan-Etsu ExpresswayMonday, May 5th, around 18:0045kmNear Takasaka SA
Central JapanOut-bound lineChuoExpresswayMay 3 (Sat), around 7:0045kmNear Fujino PA
In-bound lineTomei ExpresswayMonday, May 5th, around 19:0045kmNear Yamato TN
Western Japan / HonshiOut-bound lineChugoku ExpresswaySaturday, May 3 9:0040kmNear Takarazuka East TN
In-bound lineMeishin ExpresswaySaturday, May 3 9:0040kmNear Seta Higashi JCT

2 Request for distributed use

  • Of expected traffic congestion Drive plans with different peak days or hours!
  • Relatively little traffic congestion Drive plan from night to early morning!

Avoidance effect during peak traffic hours

For example, if you use the Tomei Shizuoka IC to Tokyo TB on May 5, 2013 (Sunday),
By shifting the departure time, you can avoid congestion and shorten the time required was. (See table below)

Image of avoidance effect during peak traffic hours

Providing road traffic information and traffic congestion prediction information

  • The latest road traffic conditions may change due to traffic congestion due to accidents and weather, so please use it before departure or while traveling.
  • The traffic congestion prediction information can be used to plan the travel date and time, as it can show the location of the traffic congestion, the traffic length for each time zone, and the peak traffic time.
  • You can use road traffic information and traffic congestion prediction information from the following sites.
    • We also distribute a traffic jam forecast information booklet (congestion forecast guide) at rest facilities.

3 Request for alleviation of traffic congestion

Customer's A little effort will help alleviate traffic congestion. Thank you for your cooperation.

In-bound image of speed decrease caution in slope, etc.
  1. Do not slow down
    In-bound in a place that is alerting the slowdown, such as slope, for your cooperation to speed recovery!
  2. Do not reduce the distance between vehicles too much
    Ensure sufficient inter-vehicle distance so that you do not press the brakes while driving!
  3. Do not concentrate on the passing lane
    Excessive lane changes during traffic jams will worsen traffic congestion!

4 Request for safe driving

Image of warning of rear-end collision at the end of traffic jam

Accidents frequently occur during traffic congestion. When using the Expressway "Wear all seat belts" When "Frequent and early breaks" Please take the following precautions. In addition, on the Expressway we guide you to the warning of a rear-end collision at the end of a traffic jam.

5 Plans for measures against congestion at rest facilities

Based on traffic congestion forecasts and past traffic congestion periods (GW, Obon, year-end and New Year holidays, etc.) Arrangement of parking lot organizers, installation of temporary toilets, and securing of parking for large vehicles We plan to implement measures against congestion, etc.

reference

In 2013 results, Traffic congestion due to accidents, etc. are included.

Traffic jam scale(1) 2014 forecast(2) FY2013 results *2Difference ((1)-(2))
totalgoing downgoing uptotalgoing downgoing uptotalgoing downgoing up
Number of traffic congestion of 10km or more * 1355 times158 times197 times375 times160 times215 times▲ 20 times▲ 2 times▲18 times
Number of traffic congestions of 30km or more32 times15 times17 times35 times19 times16 times▲ 3 times▲ 4 times+1 time
  • 1 The number of traffic jams over 10 km includes the number of traffic jams over 30 km.
  • 2 FY 2013 results are for 12 days from April 25 (Thurs) to May 6 (Mon), 2013.