[E83] Notice of nighttime ramp closure at Shinhodogaya IC Yokohama-Shindo Road

~ We will install a suspended scaffold for repainting work ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Notice of nighttime ramp closure at Shinhodogaya IC Yokohama-Shindo Road

The latest regulatory information is​ ​DraTra​ ​Please see.

PDF version 【PDF: 784KB】

March 10, 2025
East Nippon Expressway Co., Ltd.
Keihin Management Office

NEXCO EAST Keihin Management Office (Yokohama, Kanagawa Prefecture) will be closing the ramps at Shinhodogaya Interchange (hereinafter referred to as "IC") on the E83 Yokohama-Shindo Road Shindo at night to install scaffolding for repainting work.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. Closed location and date and time

  1. Closed point
    Closure ①
    Yokohama-Shindo Road Road Shinhodogaya IC
    The ramp leading from Yokohama-Shindo Road In-bound line to the Fujitsuka IC exit
    Closure②
    Yokohama-Shindo Road Road Shinhodogaya IC
    Ramp leading from National Route 16 Hodogaya Bypass in the direction of Hachioji to Yokohama-Shindo Road Out-bound
    Closure③
    Yokohama-Shindo Road Road Shinhodogaya IC
    Ramp leading from Yokohama Yokosuka Road In-bound) to Yokohama-Shindo Road Out-bound)
  2. Image of closed area
    • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
  4. Closure ① Date: March 24th (Mon) to 26th (Wed), 2025
    Backup dates: Thursday, March 27th and Monday, March 31st, 2025
    Every night from 11:30pm to 4am the next morning
    Closure② Date: Monday, April 7th to Tuesday, April 8th, 2025
    Backup date: Wednesday, April 9th to Thursday, April 10th, 2025
    Every night from 10:30pm to 4:30am the next morning
    Closure③ Date: Monday, April 14th to Thursday, April 17th, 2025
    Backup dates: Monday, April 21st to Wednesday, April 23rd, 2025
    9:30pm to 5:30am each day
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Detour

For detours, please refer to Attachments 1 to 3 [PDF: 863KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. work outline

Yokohama-Shindo Road Hanging scaffolds will be installed at each ramp of the Shin-Hodogaya IC for the repainting work.
Since it is not possible to install the hanging scaffolds under normal lane restrictions, it is necessary to close the ramps at the Shin-Hodogaya Interchange for the work.
Therefore, to minimize inconvenience to customers, the ramp will be closed at night on weekdays when traffic volume is low, so that the work can be carried out in an intensive and efficient manner. Since this work is necessary for the safe and comfortable use of Expressway, we ask for your understanding and cooperation.

Image of suspended scaffolding installationImage of a caption showing the installation of a suspended scaffold
Image of suspended scaffolding installationImage of a suspended scaffold installation caption

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

日本語
English
简体中文
繁體中文
ภาษาไทย
한국어